Laserfiche WebLink
BELFOR (0) Belfor Property Restoration <br /> PROPERTY.,,ESTOR AT ION <br /> 4320S. 131st Place Suite#100 <br /> Seattle,WA 98168 <br /> Door 2'9"X 6' 8" Opens into DOWNSTAIRS_H <br /> Door 216"X 6' 81' Opens into SMALL-HALL <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 159. Paneling 203.17 SF @ 2.14= 434.78 <br /> Paneling is wet and saturated with smoke.Allowing to replace. <br /> 160. Stain&finish paneling 203.17 SF @ 1.14= 231.61 <br /> 161. Seal the walls w/oil based/hybrid stain blocker-one coat 203.17 SF @ 0.47= 95.49 <br /> 162. Seal floor or ceiling joist system(shellac) 79.11 SF @ 0.97= 76.74 <br /> 163. Casing-2 1/4" stain grade 49.50 LF @ 2.83= 140.09 <br /> 164. Stain&finish casing 49.50 LF @ 1.07= 52.97 <br /> Casing around doors will not cost effectively detach and reset when the paneling comes off.Stain to match new paneling. <br /> 166. Thermostat-electric heat 1.00 EA @ 48.34= 48.34 <br /> 167. Light fixture 1.00 EA @ 64.52= 64.52 <br /> 168. Acoustic ceiling tile 79.11 SF @ 3.59= 284.01 <br /> 169. Acoustical Treatments Installer-per hour 1.00 HR @ 70.00= 70.00 <br /> Cutting in tiles around exposed plumbing lines. <br /> 170. Baseboard-2 1/4"stain grade 28.67 LF @ 3.01 = 86.29 <br /> 171. Stain&finish baseboard 28.67 LF @ 1.07= 30.68 <br /> Baseboard will not cost effectively detach and reset without breaking. <br /> 172. Interior door-Detach&reset-slab only 1.00 EA @ 15.51 = 15.51 <br /> 173. Paneling Installer-Finish Carpenter-per hour 1.00 HR @ 58.15= 58.15 <br /> Additional labor for cuts around the stairway. <br /> 174. Heat/AC register-Mechanically attached-Detach&reset 1.00 EA @ 14.46= 14.46 <br /> Hobby Area/Room Height: 8' 3" <br /> Window 3'5" X 1'9" Opens into Exterior <br /> Door Y X 6' 8" Opens into RECREATION_R <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 176. Soda blasting-Heavy 977.34 SF @ 2.23= 2,179.47 <br /> Soda blast remaining joist system,remaining stud walls and floor for heavy smoke. <br /> 177. 6"x 6" square wood post(3 BF per LF) 14.00 LF @ 9.78= 136.92 <br /> 178. Framing post base connector-6" 3.00 EA @ 36.87= 110.61 <br /> 179. Framing post cap connector-6" 3.00 EA @ 28.76= 86.28 <br /> 180. Joist-2x10 floor or ceiling system-treated 13.17 LF @ 2.94= 38.72 <br /> Framing along burnt wall. <br /> 181. Temporary shoring post-Screw jack(per day) 4.00 DA @ 31.04= 124.16 <br /> Jack up load bearing areas along with temp shoring. <br /> 182. 2" x 4"x 10'#2&better Fir/Larch(material only) 17.00 EA @ 5.61 = 95.37 <br /> Material and labor to shore up a temp wall to support load bearing areas where framing needs to be replaced. <br /> LIZABETH_HAUFLEI 5/29/2015 Page: 11 <br />