My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2730 OAKES AVE MARS HILL CHURCH 2018-12-05
>
Address Records
>
OAKES AVE
>
2730
>
MARS HILL CHURCH
>
2730 OAKES AVE MARS HILL CHURCH 2018-12-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:43:22 AM
Creation date
10/21/2016 8:03:15 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2730
Tenant Name
MARS HILL CHURCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U .o Ld� �TTd(QEM � „ r IT Date: 8/14/2013 <br /> Public Works Permit PW1308-009 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit##; <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 290.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MARS HILL CHURCH JASON SOUZA <br /> 1411 NE 50TH STREET 17921 BOTHEL EVERETT HWY <br /> SEATTLE WA 98107 1 WrHELL WA 98012 <br /> PHONE: 7605678066 PHONE: 4253902300 <br /> TAX PARCEL ID# SITE ADDRESS: 2730 OAKES AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> SOIL EXCAVATION <br /> (8/14/2013 10:50 AM BES) <br /> CONTAMINATED SOIL EXCAVATION <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Traffic control shall be per approved plan/MUTCD standards. <br /> 5. Install eroision control per City of Everett Standards. <br /> 6. Remove eroision control measures upon completion of the project prior to final approval of the permit.. .. <br /> 7. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> ;;°!•-_=iM��: FSI <br /> 8. Dispose soil to an approved/appropriate site. <br /> 9.The contractor must meet with the public works inspector `==' <br /> Prior to starting construction Randy Allen 425-339-7403PIP <br /> :...Y is <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> / 13 or other right-of-way use hereto applied for and further agrees <br /> d for Const cti n D to to remove same upon notice from the City and to replace <br /> p public property damaged thereby. <br /> FINAL INSPECTION Date b' 3 <br /> Approved as Constructed °—Signat f A plicant Da e <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.