Laserfiche WebLink
Residential Photovoltaic OTC Permit application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV.system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the Inspector- <br /> --------TO <br /> nspector_-„---e-TGA OE COMPLETED BY APPLICANT�..��.� <br /> Project infDrrria0pn <br /> Property Owner Name: J iH tl2 <br /> Project Address: $�ZL Sou n ✓ 7 Parcel# <br /> Clt : f r Q State: zip: <br /> Day Phone: ZS-3 — '�S <br /> Contractor Name ��H er' S �, <br /> Contractor License#: Su �” p s <br /> contractor Day Phone: 2a _ 7 — 7 Z 6 <br /> PV system description '2 � rve 10 A.,tv(/v�f-� C_. Z-Z— /77- �t <br /> (Include manufacturer � K M�u 1QS / C 5 /c �rri Sz"d LJ`' <br /> and model#of PV <br /> ft <br /> modules and & oN fP'A <br /> Inverters): <br /> aDetermine if V9Lli'PrOjeCt gU@1111e'S 0l'e7di3E'dlted PL3111111W119; <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> Is code compliantto setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101,21 <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, <br /> metal roofing, lightweight masonry,or cedar shingles, <br /> 4. The installation shall comply with the manufacturer's Instructions,[IRC M2302.2] <br /> El <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to 0 <br /> administer the electrical code,[IRC M2302.2] <br /> G. The Installation shall meet the requirements of the international Fire Code as amended Q <br /> by WA State.[IRC M2302,21 <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per p <br /> the manufacturer's specifications, [iRC M2302,2,2(1)) <br /> 8. The ground snow load does not exceed 70 pounds per square foot,[IRC M2302,2.1(2)) (� <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per•square foo;. [IRC M2302.2,1(3)] <br /> Enter total dead load of system(lbs/ftz): <br /> 10, To address uplift,modules are mounted no higher than 18"above the surface of the 0 <br /> roofing to which they are affixed, [IRC M2302,2.1(4)) — <br />