My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST OLYMPUS HALL 2017-07-26
>
Address Records
>
TOWER ST
>
2000
>
OLYMPUS HALL
>
2000 TOWER ST OLYMPUS HALL 2017-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 2:04:55 PM
Creation date
10/21/2016 9:16:37 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
OLYMPUS HALL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />N/A WALLS CONNECTED THROUGH FLOORS: Shear walls shall have interconnection between <br />stories to transfer overturning and shear forces through the floor. (Tier 2: Sec. 4.4.2.7.5) <br />Single Story Building. <br />N/A HILLSIDE SITE: For structures that are taller on one side by more than one-half story due to a <br />sloping site, all shear walls on the downhill slope shall have an aspect ratio less than 1-to-1 for <br />Life-Safety and 1-Co-2 for [mmediate Occupancy. (Tier 2: Sec. 4.4.2.7.6) <br />NC CRIPPLE WALLS: All cripple walls below first-floor-level shear walls shall be braced to the <br />foundation with shear elements. (Tier 2: Sec. 4.4.2.7.7) <br />No cripple wa!!s — SW (Shear Walls) above IS` floor are st�pported on pos/ beams. <br />Unknown OPENINGS: Walls with openings greater than 80 percent of the length shall be braced with <br />wood structural panel shear walls with aspect ratios of not more than 1.5-to 1 or shall be <br />supported by adjacent construction through positive ties capable of transferring the lateral <br />forces. (Tier 2: Sec. 4.4.2.7.8) <br />Connections <br />C WOOD POSTS: There shall be a positive connection of wood posts to the foundation. (Tier 2: <br />Sec. 4.6.3.3) <br />Wood posts are connected to the footings/%oundntion with stee! ctowel. <br />C WOOD SILLS: All wood sill s shall be bolted to the foundation. (Tier 2: Sec. 4.6.3.4) <br />Sil/ plutes are bolted @ 6'-0 "o. c. <br />NC GIRDER/COLUMN CONNECTION: There sliall be a positive connection utilizing platcs, <br />connection hardware, or straps between the girder and the column support. (Tier 2: Scc. <br />4.6.4.1) <br />Bea�ns/gi�-ders ure connected with lx scabs on each side. <br />ASCE 31-03 Seismic Evaluation of Existing Buildings Basic Structural Checklist for W2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.