Laserfiche WebLink
INSPECTION REPORT <br /> @4 <br /> Date: J Permit: �(6 � _ 0` �1 77- <br /> Contracti: <br /> t� U <br /> Owner: \1 r <br /> Site Address:� `1 <br /> SPF�TION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> F]Temp Service _ ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building(Final C❑/Gas Pipe Final ElHWT Final <br /> OTHER OR CONSULTATION: 3C� VlQ � <br /> 2.0 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> r 1 <br /> Inspector: Date: <br /> EIR(4/09) FORMS&PROMOi IONS•425/460-8900 <br />