Laserfiche WebLink
3 March 2015 (revised 8:15pm) <br /> Mr.Jeff Heilman, Development Technician <br /> City of Everett, Public Works <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: Maki Covered Patio, 81501-007 <br /> Dear Mr.Jeff Heilman <br /> Please accept this letter as follow up to our phone conversation yesterday, March 2, 2015 and today's <br /> email. <br /> 1. The four new PT(pressure treated) 6 x 6 posts, located at the deck addition, are to be continuous, <br /> they are to extend from the bottom of the roof beams down into the concrete footing. <br /> 2. New 6 x 10 PT deck floor beams shall be hung from the continuous 6 x 6 PT post with Simpson <br /> HUC610 concealed hanger. <br /> 3. All framing hardware connected to pressure treated material shall be hot dipped galvanized per <br /> Foundation note#10. <br /> 4. All exposed lumber to be pressure treated material per plan notes and details. <br /> If you have any questions please call 425-344-9942 or contact me at <br /> i GonzalesDesignPartners@hotmail.com <br /> Sincerely, <br /> Ruth E. Gonzales, Architect#5360 <br /> Gonzales Design Partners <br /> P.O. Box 97 <br /> Arlington, Washington 98223 <br />