Laserfiche WebLink
INSPECTION REPORT <br /> Date: '2� _ Permit:J5 I W 1 -6q'07- <br /> Contractor: W k7ml� <br /> Owner: <br /> dress: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Gr rk ❑Footing ❑Rough In ❑Rough In <br /> rRh <br /> ndu ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> RoughIn ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Framing ❑Rooftop Units ❑Water Service <br /> ing ❑Insulation ❑Mechanical Final El Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK C.O. ❑ VIOLATION <br /> �; P RL TO PERFORM INSPECTION: <br /> _LLL(42 )257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) )4a/CL&dr R fM& ROMOTIONS 425/400-8900 <br />