My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2103 RAINIER AVE 2016-10-21
>
Address Records
>
RAINIER AVE
>
2103
>
2103 RAINIER AVE 2016-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 10:56:02 AM
Creation date
10/21/2016 10:56:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2103
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPOle <br /> Date 3/�S f 4j Permt: v)140'3,C�® <br /> 1 <br /> Contractor: <br /> Owner: <br /> e o <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑_P>eIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. FI-CUPRECTION REQUESTED <br /> ❑ OK FOR C.O. IOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> gar) <br /> Inspector: / Dater /� <br /> E I R(10/06) ,... L <br />
The URL can be used to link to this page
Your browser does not support the video tag.