Laserfiche WebLink
INSPECTION REPORT <br /> Date//Z D � Permit: 7 -6 ` 'K/ <br /> Contractor: <br /> Owner: <br /> 6 <br /> Site Address: 3 / <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final Gas Pipe Final ❑HWT Final <br /> OTHER OR ONSULTATION: �'tr •C��LY/� - �� <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION RE ESTE C <br /> *F <br /> TO PERFORM SPECTION <br /> VIOLATION <br /> LL(425)/257-8881 FOR REINSPECTION-24 hournoticere/gquired <br /> i/7 "� `tom l%fry 6 . <br /> Inspector: Date: <br /> E I R(10/06) DAIABAR,INC- <br />