Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: C <br /> Contractor: C.� 1� <br /> Gt �p�� lle�� Owner: S- ( ac� r M I <br /> V vl <br /> Site AddressI i� <br /> (� � _1�3t <br /> OF INSPECTION REQUESTED <br /> ELECTRICAL UIL IN MECHANICAL PLUMBING <br /> ❑Temp Service ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footin ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ndation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:I-Q,b q Z 47.9 0 <br /> ❑ APPROVAL IALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: �„ Date: <br /> EIR(4/09) /r/Jf1j(�] FORMS&PROMOTIONS•425/488-8780 <br />