Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: <br /> Contractor: <br /> Owner:- V ff <br /> ii1 A W <br /> Site Address: I <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas <br /> QPipe <br /> �Final ElHWT Final <br /> OTHER CONSUL-"ATION: S— COQ �.S "�""" �� '" m?, <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER-MIT EIr <br /> ❑ OK FOR T.C.U. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. F-1VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8681 FOR REINSPECTION-24 hour notice required <br /> i <br /> a <br /> i <br /> Inspec Date: <br /> EIR(410 FORMK w PROMOTIONS•425/48849900 <br />