Laserfiche WebLink
i <br /> INSPECTION REPORT <br /> LT Date Permit: (s� '''V Vz <br /> Contractor: <br /> Owner: <br /> Site Address: '-Lo �1 <br /> TY OF INSPECTION REQUESTED <br /> ELECTRICAL ILDI MECHANICAL PLUMBING <br /> ❑Temp Service t-U'FER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ce ing Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains SAuilding Final ❑Gas Pipe Final ❑HWT Final <br /> 'DZIWO <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F-1OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: - <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 ho/ur`notice required <br /> �/ <br /> Inspector: Date: <br /> EIR(10/06) DATABAR.INC. <br />