Laserfiche WebLink
COST ESTIMATE SHEET <br />Public Works Department <br />Streets Division <br />3200 Cedar Street Everett WA 98201 <br />425-257-8821 <br />Fax 425-Z57-8882 <br />Date 03/25/2016 <br />Work Order # <br />Service Order # <br />Contact Person Loretta Root Telephone #623-537-9323 <br />Requested By <br />Property Owner (Name) Anita Antl <br />�ddress: 2332 3ak�r �,v�. C;ty `v�rett Zi� 9�201 <br />Installation Location Same <br />Installation type/description Sidewalk• 95' X 5' X 4" = 6 cu�rd. concrete <br />The following estimate is based upon the Street Division work group providing all labor and equipment. <br />Itemized Cost Estimate: <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />Sales Tax <br />TOTAL <br />0 <br />concrete; 6 cu. yd. $98.50 per cu. yd. <br />0 <br />0 <br />0 <br />591.0 <br />Prepared by: Bob Sorgen Date Estimate Prepared: 03/25/2016 <br />� -, -�— <br />Accepted by: °c� l� �' '� � ��� Representing: /1/L£� ��:f'7� <br />(Signature) <br />Please sign and return estimate to address above, Attn. Bob Sorgen <br />ESTIMATE GOOD FOR 6 MONTHS <br />Estimate Only <br />DO NOT SEND CHECK <br />C:\Users\BSORGEN\Documents\Sidewall: �st.imales\2333ttal:cr'LSidewalk!CU57' 15577➢7!17'l; SH�P:'PLdocx <br />