My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6607 HIGHLAND DR 2016-10-24
>
Address Records
>
HIGHLAND DR
>
6607
>
6607 HIGHLAND DR 2016-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 3:51:58 AM
Creation date
10/24/2016 8:43:40 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
6607
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order <br />ISSU@d By HLJ HUSBY, LANCE J. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 1/27/2016 <br />Fund 40� Account 5 Program ��o <br />Program <br />TItl2 REPAIR .75 INCH 6607 HIGHLAND DR 710119675 <br />Function 119 <br />Page 2 <br />9/15/2016 7:16 <br />Activity s�5 <br />Work Order No 20160349 Project Activity Type CORRECTIVE MAINTENANCE StBtUS CL <br />Status 1/27/2016 Time o�:a� Original WO Billing <br />Problem Details <br />CONTRACTOR /NSTALL/NG NEW S/DEWALKS FOR SHORT PLOT, NEED <br />SHUT-OFF MOVED TO BEH/ND SIDEWALK. MOVED AND INSTALLED .75 <br />INCH SETTER WITH JUMPER AND BOX. <br />Structure ID StrTvp Activitv <br />WS0685S010 WASRVC <br />Address 6607 HIGHLAND DR <br />Cross Street <br />Compl Date Comments <br />YES 1/26/2016 <br />Area Designator Structure Location <br />Map Reference 6607 HIGHLAND DR <br />Location <br />Type <br />V <br />V <br />V <br />Vehicle Costs <br />Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br />J0094 09 NAVISTAR REAR DUMP 2 70.4 01/26/2016 <br />H0015 1999 VACTOR 2 91.2 01/26/2016 <br />J0116 2013 F550 4X4 DIESEL REG CAG 2 23.6 01/26/2016 <br />Total Vehicle Cost $185.20 <br />Material Costs Billing <br />Quantity Cost Date War <br />1 15.091 01 /27/2016 PAP <br />1 15.55 01 /27/2016 PAP <br />(SMALL) 1 71.275 01/27/2016 PAP <br />8 2.528 01 /27l2016 PAP <br />GTH VINO 1, 103.39 01/27/2016 PAP <br />Total Material Cost $2o�.sa <br />Personnel Costs <br />Type Mater No <br />M ADAP34000647 <br />M ADAP34000547 <br />M BOX000154347 <br />M PIPE34060647 <br />M SETT34149747 <br />Description <br />ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE <br />ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE <br />BOX METER MOLDED PLASTIC W/DI LID 11" X 18" <br />PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 <br />SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LEN <br />Type ID Name Hours Cost Billing Date Earning Code Class <br />P BRP BIGLEY, RYAN P. 2 63.54 01/26/2016 <br />P MAR MOE, AARON R. 2 52.264 01/26/2016 <br />P RDC RICHARDSON, DAN C. 2 64.284 01/26/2016 <br />Total Personnel Cost S�so.os <br />Tota/ Cost $573.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.