Laserfiche WebLink
• • ITTEMYTOMM MIMI rMw-MOTI'M <br /> If vertical fenestration area exceeds maximum allotwd per Section C402.3.1,then Target Area Adjustment ofall applicable envelope elements is required <br /> This mrksheetautomaticallycalculatesthese adjustments and updates target areas in the ENV-UA and ENV-SHGC Uorksheets. Information shown in <br /> this nnrksheet is for reference only and is write-protected.Submit this Target Area Adjustment form with ENV-UA and ENV-SHGC forms. <br /> VF=Vertical fenestration NW=Net above grade w all(excludes fenestration and doors.) <br /> DR=Opaque doors Gross Exterior Above-Grade Wall Area=VF+NW+DR <br /> AG=Above-grade <br /> Proposed Areas <br /> Vertical Fenestration-> VF= 6216.0 <br /> Opaque- NW= 40587.0 DR= 4251.0 <br /> Gross Exterior Max Vert.Fen.% Maximum Target <br /> AG Wall Area (0402.3.1) Vert.Fen.Area <br /> 51054.0X 30.0% - 100 = 15316.2 <br /> total Vertical Delta Vertical Excess Vertical <br /> Fenestration Maximum Target Fenestration 0 Fenestration <br /> 6216.0 - 15316.2 = -9100.2 II greater = <br /> -9100.2 <br /> Multiplier applied to all <br /> Total Vertical Excess Vertical Target Vertical Total Vertical Proposed Vertical <br /> Fenestration Fenestration Fenestration Fenestration Target VF Multiplier Fenestration Areas to <br /> 6216.0 - = 6216.0 - 6216.0 = 1.00 calculate Target Vertical <br /> Fenestration Area <br /> Net AG Wall Area Excess Fenestration Target Net Wall Area Net Wall Target Net Wall MU L Multiplierappliedto all <br /> 40587.0 + = 40587.0 - 40587.0 = 1.00 Proposed Opaque Above- <br /> Grade Wall Areas to <br /> calculate TargetAbove- <br /> UA Adjustments Grade Wall Area <br /> Vertical Fenestration Proposed Area Target VF Mult. Target Area <br /> Non-metal frame X = <br /> Metal frame,fixed 6090.0 X 1.00 = 6090.0 <br /> Metal frame,operable X = <br /> Metal frame,entrance door 126.0 X 1.00 = 126.0 <br /> Target areas in shaded <br /> Above-grade Wall Proposed Area Target Net Wall Mult. Target Area boxes are applied to <br /> Steel FrameX = target areas on ENV-UA <br /> Metal Building = <br /> Wood/Other frame X = <br /> Mass 40587.0 X 1.00 = 40587.0 <br /> Sum of target above-grad <br /> Sum of Proposed 46803.0 Sum of Target 46803.0 wall and vertical <br /> fenestration areas are <br /> calculated to equal the <br /> SHGC x A Adjustments sum ofproposed <br /> Non-North Vertical Fenestration Proposed Area Target VF Mult. Target Area <br /> PF<0.2 6216.0 X 1.00 = 6216.0 <br /> 0.2<_PF<0.5 X = <br /> PF z 0.5 X = SHGC target areas in <br /> North Vertical Fenestration shaded boxes are applied <br /> to target areas on ENV- <br /> PF<02 X = SHGC <br /> 0.2<PF<0.5 X = <br /> PF Z 0.5 X = <br /> Franklin Engineering 625 4th Ave Ste 202 Kirkland, WA 98033 <br />