My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6301 36TH AVE W 2016-11-01
>
Address Records
>
36TH AVE W
>
6301
>
6301 36TH AVE W 2016-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 3:54:49 PM
Creation date
10/24/2016 11:19:27 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6301
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REINFORCING SCHEDULE <br /> TOTAL NUMBER OF TOTAL WALL REINFORCEMENT REINFORCEMENT HEIGHT <br /> PANELS IN WALL HEIGHT'W LAYER NO. TYPE LENGTH (FT) 12'COMPACTED PEDESTRIAN FENCE <br /> L <br /> STRUCTURAL FILL PER IBC 1607.7 IF REQUIRED <br /> 3 OR LESS NO REINFORCEMENT REQUIRED TYPICAL LOCK-LOAD©UNIT <br /> ROADWAY <br /> 4 5?FT .66 <br /> Z MIRAFI S%T 4,5 FT 1.99 16• " <br /> 1 5.5 FT 0.86 <br /> 5 6.7 FT 2 MIRAFI 5 XT 515 FT 1.99 !l <br /> 3 5.5 FT 4.65 <br /> 1 6.5 FT 0.66 GENERAL NOTES _ _ _ _ _ _ _ LAYERB <br /> 6 8.0 FT 2 MIRAFI 5 XL 6.5 FT 1.99 1. REFER TO CIVIL GRADING PLANS FOR WALL ALIGNMENTS AND ELEVATIONS. �- <br /> 3 8.5 FT 4.65 <br /> 2. REFER TO REINFORCING SCHEDULE FOR GEOGRID LENGTHS.AND ELEVATIONS. GRANULAR FILL COMPACTED TO 95% <br /> 1 7.5 FT 0.66 3. GEOGRID ELEVATION MEASURED FROM TOP OF CRUSHED ROCK LEVELING PAD. - ///�-OF SOILS MAXIMUM DRY DENSITY PER <br /> 7 9.3 FT 3 MIRAFI 5XT �.5 FT 4 8�5 \ ASTM D•1557(MODIFIED PROCTOR) <br /> 4. GEOGRI0 LENGTH 1'MEASURED FROM BACK OF FACE UNIT. /) SEE NOTE 10 <br /> 7.5 FT 7.37 S. GEOGRID SHALL BE INSTALLED BEFWD WALL WITH MACHINE DIRECTION(STRONGEST <br /> B.5 FT 0.68 AXIS)PERPENDICULAR TO WALL. _ <br /> LAYER 7 <br /> 8 10.7 FT MIRAFI 5 XT 5'5 FT 1 6. GEOGRID SHALL BE INSTALLED ON HORIZONTAL SURFACE OF COMPACTED STRUCTURAL FILL. <br /> 8.5 FT 7.31 7_ GEOGRID SHALL BE PULLED TIGHT BEHIND WALL.STAKE END OF GEOGRID AS REQUIRED <br /> 1 10.0 FT 0.66 TO MAINTAIN TENSION BEFORE COVERING WITH STRUCTURAL FILL, <br /> 2 10.0 FT 1.99 <br /> 3 12.0 FT 3 MIRAFI 5XT 10.0 FT 4 8. PROTECT GEOGRID FROM CONSTRUCTION DAMAGE PER MANUFACTURERS SPECIFICATIONS. <br /> 4 10.0 FT 731 CONSTRUCTION EQUIPMENT SHALL NOT TRAVEL DIRECTLY ON GEOGRID.ANY GEOGRID THAT IS LAVER 6 <br /> 10.0 FT 9,97 DAMAGED SHALL BE REPLACED WITH NEW GEOGRID AT CONTRACTORS EXPENSE. - - - - - - - - - <br /> 1 11.0 FT 0.66 9. LOCK+LOACP WALL ASSEMBLY TO BE COMPLETED PER MANUFACTURERS SPECIFICATIONS. <br /> 2 11'0 FT 1.99 10, STRUCTURAL FILL SHALL BE PUCED AND COMPACTED ACCORDING TO RECOMMENDATIONS <br /> 10 13.3 FT 3 MIRAFI 5 XT 11.0 FT 4.65 'H' <br /> 4 it 0 FT 7 91 PROVIDED IN THE GEOTECHNICAL REPORT,POWDERMILL BUSINESS CENTER,EVERETT.WASHINGTON, <br /> 5 11)FT 9w97 PROJECT NO.Tb241,PREPARED BY TERRA ASSOCIATES.INC..DATED JUNE 2014 GEOGRID-SEE REINFORCING SCHEDULE <br /> STRUCTURAL FILL IN REINFORCED ZONE SHALL BE GRANUALR MATERIAL WITH A MAXIMUM <br /> 1 12.0 FT 0.66 AGGREGATE SIZE OF 34NCFES AND A MAXIMUM SOIL FINES(LESS THAN k 200 SIEVE) i^+ LAVER 5 <br /> 2 12.0 FT 1.99 CONTENT OF 30 PERCENT. - - - - - - - - <br /> I 14.7 FT 4 MIRAFI S XT 12.0 FT 7 .751 11. HEAVY CONSTRUCTION EOUIPMENT SUCH AS VIBRATORY DRUM ROLLERS.LOADED DUMP TRUCKS, <br /> 5 12 0 FT 997 FRONT-END LOADERS,ETC.,SHALL NOT OPERATE WITHIN FIVE FEET OF BACK OF WALLS. <br /> 6 120 FT 1283 STRUCTURAL FILL PLACED IN THIS ZONE SHALL HAVE MAXIMUM LOOSE LIFT THICKNESS OF 12 <br /> INCHES AND SHALL BE COMPACTED USING HAND OPERATED COMPACTION EQUIPMENT. WALL 64TTER <br /> 1 13.0 FT 0.66 701(V.H <br /> 12 16.0 FT MIRAFI S XT ) <br /> Z 13.0 FT 1.99 <br /> 3 13.0 FT 7.31 - - <br /> 0 FT 4.85 <br /> 13. LAVER 4 <br /> 4 1 <br /> 5 13.0 FT 9.97 nn - <br /> 6 13.0 FT 12.63 10Y 12'MIN.COMPACTED I/TTO 1'CLEAN CRUSHED <br /> 1 14.0 FT 0.66 ROCK DRAINAGE FILL(NO SOIL FINES) <br /> 2 14.0 FT 1.99 <br /> 3 14.0 FT 4.85 <br /> 13 17.3 FT 4 rAIRAFI5 XT 14.0 FT 7.31 LAYER <br /> 5 14.0 FT 9.97 fi: - - - - - - - - - <br /> 6 14.0 PT 12.63 <br /> 7 14.0 FT 15.29 - <br /> 1 15.0 FT 0.66 .- <br /> 2 15.0 FT 1.99 - <br /> 3 15.0 FT 4.65 <br /> 14 18.7 FT 4 MIRAFI7XT 15.0 FT 7.31 NT LPE GRAD MINIMUM WAL N <br /> 5 15D FRO <br /> FT 9.97 HORIZ NTAL LAYER2 <br /> 6 71.0 FT 1263 3M.1V 1.33' "7 - - - - - - - <br /> 7 15.0 FT 15.29 2H 1V 2151 6'DIAMETER PERFORATED PVC <br /> 1 16.0 FT 0.66 PIPE TAKEN TO APPROVED POINT <br /> 2 MAX - 5� OF DISCHARGE LAYER 1 <br /> 2 16.0 FT 1.99 tp' S MIN <br /> 3 16.0 FT 4.85 v o - <br /> 20.0 FT 4 L7IRAFI7 XT 16.0 FT 7.31 <br /> 5 78.0 FT 9.97 8', __ ,•MiN.7a�•SrS+ �L'�"i+ , i.�.Taw' ;✓ <br /> 6 16.0 FT 12.63 <br /> 7 16.0 FT 7529 ? COMPETENT NATIVE SOIL <br /> 8 16.0 FT 17.95 FIRM UNDISTURBEDJ T ISM 578•MINUS CRUSHED ROCK OR STRUCTURAL FILL <br /> I 17.0 FT 0.68 SOIL TO BE VERIFIED NOT TO SCALE LEVELING PAD <br /> 2 17'0 FT 1.99 BY GEOTECHNICAL ENGINEER <br /> 3 17.0 FT 4.65 <br /> 16 213 FT5 MIRAFI7XT 17.0 FT 9.97 Terra LOCK+LOAD WALL <br /> 6 17.0 F 12.83 POWDERMILL BUSINESS CENTER <br /> 7 17.0 FT 15.29 <br /> 8 1Z0 FT 17.95 Associates, Inc. EVERETT,WASHINGTON <br /> Consultants in Geotechnical Engineering <br /> NOTE: I DIMENSIONS <br /> Geology and ELEVATION TOLERANCE 2.S <br /> ALLL DIMENSIONS ARE IN FEET Environmental Earth SOlen-S Proj,No.T-6241 Date JUNE 20141 Figure 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.