My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2411 PINE ST B 2016-10-24
>
Address Records
>
PINE ST
>
2411
>
2411 PINE ST B 2016-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 4:01:03 AM
Creation date
10/24/2016 3:56:56 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2411
Unit
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order <br />Issued By oBs OLHAVA, Bwa� s. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 2/3/2016 <br />Fund ao� Account 5 Program ��o Function �os <br />Program <br />Title REPLACE 24116 PINE ST 710109675 <br />Work Order No 20160421 Project Activity Type SERVICE REQUEST <br />Status 2/3/2016 Time oa:5� Original WO Billing <br />Customer Information <br />Customer Name KADDAS, �ouis Customer ld <br />Address Street <br />Apartment No City <br />State Zip <br />Subdivision Change Map Y/N <br />Phone No i 425 ) 344-0737 Ext <br />Second Phone ( ) - Ext <br />E-Mail Address <br />Problem Information <br />Address 2411 B Street p/NE ST <br />From Cross Street <br />To Cross Street <br />City Zip <br />Subdivision Map Book Map Reference <br />Page 1 <br />9/15/2016 11:18 <br />Activity 6�5 <br />Status c� <br />Problem SEWER SEWER <br />Sub Problem SS SIDE SEWER <br />Requested By MCL1 MALLAND, cHA� �. Date Requested 1/5/2016 <br />Agency Related Request 00149040 <br />Initiated From PUBLIC PUBLIC <br />Utility Locate (USA) No �so2�s2o Called Date Expiration Date <br />Assignment Information <br />Dept Pw PUBLIC WORKS Priority Estimated Hours <br />Ct'@W SCONST SEWER CONSTRUCTION (OLHAVA) <br />Contractor <br />Assigned To LBM LESTER, BRIAN M. <br />Assigned By oBs OLHAVA, BRa� s. <br />Assigned Date To Be Comp Date <br />Scheduled Date Scheduled Time <br />Route Route Sequence <br />Comments <br />Action Taken REPLACE SIDE SEWER IN R.O.W. FOR 2411 8 2411 #B PINE. CONCRETE PATCH 3'X5'X4. <br />Recommended Action REPLACE SS FROM MAIN TO PROPERTY LINE <br />Approved By LBM LESTER, aRiA►v nn. Job Cost Information(Y/N) <br />Start Date i i Time Date Completed 2/1/2016 <br />Completed By Time Follow Up? <br />Permit No <br />
The URL can be used to link to this page
Your browser does not support the video tag.