My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/10/19 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/10/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 11:51:43 AM
Creation date
10/25/2016 11:51:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/19/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA SNE ENGINEERING, INC. <br /> Electrical and Technology Consultants <br /> September 13, 2016 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street <br /> Everett, WA <br /> Attention: Rich Hefti, Project Manager <br /> Subject: Everett Three Lakes Pressure Sustaining Valve <br /> Electrical Design Scope and Fee Estimate <br /> Rich, <br /> in response to the City's request to provide electrical power and controls for a new Pressure <br /> Sustaining Valve installation at the site of the existing Ball Valve Type PRV, we have developed this <br /> scope and fee estimate. We understand that the existing PRV has a three phase 230 VAC electric <br /> service and telemetry communications. The City requests we design standby power for this facility <br /> with an Automatic Transfer Switch and Standby diesel engine generator in a sound attenuated <br /> enclosure. The City wants to provide power and controls to the new 36" PSV vault with lighting, <br /> receptacles, a sump pump, exhaust fan and heat. We will monitor pipeline pressure above and below <br /> the PSV and will provide a remote operator interface in the PSV Vault. We will provide conduit and <br /> wiring back to the building for power, controls and telemetry monitoring. A future Flow meter vault will <br /> be provided for either an insertion type flow meter or a strap on ultrasonic flow meter. This future <br /> vault will require a sump pump and lighting, but no heat or exhaust fan. We understand that the City <br /> requests that the project design be completed by January 2017 and bid thereafter. The construction <br /> is expected to take into early 2018. A 60% submittal will be scheduled for September or early <br /> October. <br /> To accomplish this we anticipate the following design tasks: <br /> 1. A site visit to check the installation with the original design drawings and mark changes that have <br /> been made by the City in construction of the block building. <br /> 2. Provide a one line diagram for the existing service with the addition of the ATS and standby <br /> generator and power extensions to the new PSV Vault and the future Flow Meter Vault. Provide a <br /> demand calculation to verify that all new equipment will fit within the existing service. <br /> 3. Generator calculations to determine that the station loads will start and run. <br /> 4. A plan and elevation for the new PSV vault with all equipment and wiring shown. <br /> 5. Control wiring for the PSV, open and close solenoids, valve position indication, upstream and <br /> downstream pressure transmitters and the future flow meter. <br /> 6. Telemetry Control Panel additions shown in elevation. <br /> We will provide the following construction services tasks: <br /> 7. Contractor questions during bidding. <br /> 8. Submittal reviews. <br /> 9. Response to contractor questions during construction <br /> 128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.