Laserfiche WebLink
Work Activity Work Order Page 2 <br />8/26/2016 10:26 <br />ISSU@d By HLJ HUSBY, LANCE J. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 7/5/2016 <br />Fund ao� Account s Program Function Activity <br />Program UT3473 10 3 <br />Title CONVERT .75 INCH 1427 100TH ST SW #88 UT3473-10-3 <br />Work Order No 20161792 Project Activity Type CORRECTIVE MAINTENANCE StBtUS CL <br />Status 7/5/2016 TI1712 13:54 Original WO Billing <br />Problem Details <br />CONVERT .75 /NCH CURBSTOP TO .75 /NCH SETTER WITH METER AND <br />BOX. FLAT TO METER PROJECT. <br />Structure ID StrTvp Activit <br />WS 1484Z043 WAS RVC <br />Address 1427 100TH ST SW <br />Cross Street <br />Compl Date Comments <br />YES 7/6/2016 <br />Area Designator Structure Location <br />Map Reference A RD - LOT 8 <br />Location <br />Material Costs Billing <br />Type Mater No Description Quantity Cost Date V� <br />M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 2 30.934 07/08/2016 I <br />M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 4 63.54 07/O8/2016 I <br />M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11" X 18" (SMALL) 1 71.275 07/O8/2016 I <br />M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS (1/4 BEND) 2 9.98 07/08/2016 ( <br />M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 190.161 07/08/2016 I <br />M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .948 07/O8/2016 I <br />M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VI/VO 1 103.51 07/O8/2016 I <br />— - -- - <br />Total Material Cost $a�o.35 <br />NA Costs ' <br />Type Na No Description Quantity Cost Billing Date V` <br />NA N/A SAND .25 4.75 07/08/2016 <br />Type ID <br />P RDC <br />P WDL <br />-- _ <br />Total NA Cost $4.75 <br />Personnel Costs <br />Name Hours Cost Billing Date Earning Code Class <br />RICHARDSON, DAN C. 1 32.144 07/06/2016 <br />WEAVER, DEAN L. 1 33.725 07/06/2016 <br />_ _ __ <br />Total Personnel Cost $ss.s� <br />Total Cost $540.97 <br />