My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3053-08
>
Ordinances
>
Ordinance 3053-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2016 11:19:21 AM
Creation date
10/28/2016 11:18:50 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3053-08
Date
2/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Areas not planned for intensive urban development that have the potential for ecological <br /> rehabilitation. <br /> Areas Designated <br /> 1. Park zoned properties located south and southeast of the BNSF southeast property <br /> lines between the Mukilteo Tank farm site and the Port of Everett's south terminal <br /> (See Figure 4.10): All of the park zoned properties located south and southeast of the <br /> BNSF property lines,except for the wetlands designated Conservancy. This includes <br /> portions of Howarth Park and Forest Park. <br /> 2. Park zoned properties located above Maulsby Swamp (See Figure 4.17): All of the <br /> park zoned property within 200 feet of the ordinary high water mark of Maulsby Swamp. <br /> 3. Langus Riverfront Park (See Figure 4.19): All of the city-owned property located <br /> east of the ordinary high water mark of the Snohomish River and west of the east edge of <br /> the I-5 right-of-way, except for the cut-off tidal channel. The waterward boundary is the <br /> ordinary high water mark. <br /> 4. South Simpson Site (See Figure 4.14): All of the Simpson site/BNSF right-of-way <br /> located south of the development pad in shoreline jurisdiction,except for Bigelow Creek <br /> and the Category 1 wetlands and their associated buffers required by the SMP and the <br /> buffer along the Snohomish River required by the SMP. The west boundary is 200 feet <br /> from the OHWM or the floodplain boundary,whichever is further west, except that <br /> where the floodplain boundary is more than 200 feet from the OHWM, shoreline <br /> jurisdiction shall not extend beyond the west edge of the BNSF right-of-way. <br /> 5. Rotary Park(See Figure 4.20): All of Rotary Park. The north boundary is the OHWM <br /> of the Snohomish River,the south boundary is the northern edge of Lowell Snohomish <br /> River Road,the east and west boundaries are the City of Everett Rotary Park property <br /> lines. (Rev. 11/17/05) <br /> Vision Statement <br /> The Category 3 wetlands on the Simpson site will be for conservation <br /> and park purposes, except for transportation and utility access. The <br /> southern portion of the site should be open space and park use. A road <br /> connecting the River Road with the 41'interchange via the development <br /> pad may be located on the southern portion of the site. <br /> Vision Statement <br /> Rotary Park will be used for public parks and public access, and <br /> restoration/mitigation. <br /> 6. Silver Lake (See Figure 4.11): The City-owned Thornton A. Sullivan Park on Silver <br /> Lake and the property recently purchased by the City for park expansion. (Parcels 3028 <br /> 051 002 00, 3028 051 008 00, 3028 051 036 00, 3028 051 038 00). The waterward <br /> boundary is the ordinary high water mark. The western boundary is 200 feet from the <br /> ordinary high water mark. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.