My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3053-08
>
Ordinances
>
Ordinance 3053-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2016 11:19:21 AM
Creation date
10/28/2016 11:18:50 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3053-08
Date
2/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> 1. The area south and west of the Snohomish River extending from the north boundary of <br /> the Urban Maritime Environment to the southernmost edge of the SR 2 right-of-way, <br /> except for the City-owned property located north of the I-5 crossing of the Snohomish <br /> River(parcel number 1629 053 002 00). The waterward boundary is the ordinary high <br /> water mark. The landward boundary is 200 feet from the ordinary high water mark. <br /> (See Figures 4.4,4.5,and 4.6) <br /> 2. The area within 200 feet of the ordinary high water mark of Maulsby Swamp located <br /> west of the east line of the Burlington Northern right-of-way and north of the Urban <br /> Maritime environment. (See Figure 4.4) <br /> 3. The M-2,Heavy Manufacturing Zoned property within shoreline jurisdiction located in <br /> south Lowell near the River bend(not mapped; if mapped would be on Figure 4.20): <br /> Any M-2 zoned property within 200 feet of the OHWM located west of the BNSF right- <br /> of-way. The actual edge of OHWM would have to be determined to see if any of the M- <br /> 2 zoned property would fall in shoreline jurisdiction. If any,this area would be too small <br /> to show up on the maps. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> 4.5 Urban Industrial <br /> Purpose <br /> To provide areas for high intensity water-dependent and water-related industrial uses along <br /> navigation channels accessible to shallow draft vessels, and to ensure optimum use of shorelines <br /> that are presently industrial in nature while protecting and restoring ecological functions. <br /> Classification Criteria <br /> 1. Shorelines that front on navigable waters of varying depth and have varying levels of <br /> upland access. <br /> 2. Areas highly modified by past industrial activities. <br /> Area Designated <br /> 1. The area south and west of the Snohomish River extending from the north boundary of <br /> the Urban Maritime Environment to the southernmost edge of the SR 2 right-of-way, <br /> except for the City-owned property located north of the I-5 crossing of the Snohomish <br /> River(parcel number 1629 053 002 00). The waterward boundary is the ordinary high <br /> water mark. The landward boundary is 200 feet from the ordinary high water mark or <br /> 200 feet from the floodway,whichever is further inland. (See Figures 4.4,4.5, and 4.6) <br /> 2. The area within 200 feet of the ordinary high water mark of Maulsby Swamp located <br /> west of the east line of the Burlington Northern right-of-way and north of the Urban <br /> Maritime environment. (See Figure 4.4) <br /> 3. The M-2, Heavy Manufacturing and B-2, Community Business with contract zoned <br /> property within shoreline jurisdiction located in south Lowell near the River bend. All <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.