Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 5/12/2014 <br /> eli 140/,_,LP. <br /> City of Everett Public Works Department Public Works Permit#: PW1405-020 <br /> 3200 Cedar Street Building Permit#; <br /> T Everett, WA 98201 <br /> Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee$: $ 645.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BOEING COMPANY MEYER MICHAEL/URS CORP <br /> PO BOX 3707 MS 1 F 09 1504 4TH AVE STE 1400 <br /> SEATTLE WA 98124 SEATTLE WA 98101 <br /> PHONE: PHONE: 2064382226 <br /> TAX PARCEL ID# 28041500400500 SITE ADDRESS: 94TH ST SW&29TH AVE W <br /> DESCRIPTION OF PROPOSED WORK: <br /> SOIL & SEDIMENT REMOVAL INTERIM ACTION (IA) -Ot [ 4 CF cyo 3 lu. a61- ,A <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Per plans submitted by URS approved 5/12/2014. <br /> Your Public Works Inspector is Cliff Lindman. Call 425-339-7404 for any questions and/or inspections. >.__ :_.., <br /> Cin <br /> C <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> � i or other right-of-way use hereto applied for and further agrees <br /> ®''� �� �Z �� to remove same upon notice from the City and to replace <br /> Approved for Construction Date public property damaged thereby. <br /> FINAL INSPECTION Date (.f`iU 0,5 ti 5l 111(4 <br /> Approved as Constructed Sign ure of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> C.& <br />