My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3071-08
>
Ordinances
>
Ordinance 3071-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 9:00:35 AM
Creation date
10/31/2016 9:00:23 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3071-08
Date
5/7/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.8 Additional Pretreatment Measures <br /> A. Whenever deemed necessary, the Director may require users to restrict their <br /> discharge during peak flow periods, designate that certain wastewater be <br /> discharged only into specific sewers, relocate and/or consolidate points of <br /> discharge, separate sewage wastestreams from industrial wastestreams, and such <br /> other conditions as may be necessary to protect the POTW and determine the <br /> user's compliance with the requirements of this ordinance. <br /> B. When determined necessary by the Director, each user discharging into the <br /> POTW, shall install and maintain, on his property and at his expense, a suitable <br /> storage and flow-control facility to ensure equalization of flow. The Director may <br /> require the facility to be equipped with alarms and a rate of discharge controller, <br /> the regulation of which shall be determined by the Director. A wastewater <br /> Discharge Authorization(DA) may be issued solely for flow equalization. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.