Laserfiche WebLink
NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: Approval. <br /> 1. The Comprehensive Plan land use map in the expansion area is hereby amended from 1.3 <br /> (Single Family) and 4.4 (Mixed Use Commercial—Multi Family) to Colleges/Universities <br /> (2.2), as depicted in Exhibit A. <br /> 2. The expansion area is hereby rezoned from B-2 (Community Business) and R-2 (Single <br /> Family) to B-2-I (Institutional Overlay) and R-2-I(Institutional Overlay), as depicted in Exhibit <br /> B. <br /> 3. The Planning Department is instructed to amend the Comprehensive Plan map and <br /> Zoning Map to reflect the changes made under 1 and 2, above. In the event of conflict between <br /> the attached legal description and City maps of the action areas defined herein, the maps shall <br /> guide boundary location decisions. <br /> 4. The Development Master Plan, based on phases of construction attached to this document <br /> as Exhibits C and D, are approved subject to conditions set forth herein. <br /> Section 2: Conditions of Approval. <br /> 1. Exhibits A, B, C, D, E and F are hereby made part of this approval and incorporated <br /> herein by reference. <br /> 2. Building heights and setbacks shall be in accordance with the building area height map <br /> found at Exhibit E. <br /> 3. Any development standard not specified in this Ordinance, or the previous two Master <br /> Plan Ordinances for ECC, specifically Ordinance 2232-97 and Ordinance 2849-05, shall be <br /> determined by applicable underlying zone for the given location within the Master Plan area, as <br /> found in the Everett Zoning Code, Title 19. <br /> 4. ECC shall continue to provide off-street parking and access improvements <br /> 5. Principal access to the campus shall be taken from Broadway and North Broadway over <br /> the long term. <br /> 6. New construction in the expansion area established herein shall to the extent feasible be <br /> compatible with surrounding areas and uses. <br /> 7 <br />