Laserfiche WebLink
• • <br /> • <br /> Residential Photovoltaic OTC Permit Application <br /> _1 • /7i <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . In this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> Property Owner Name: Mary Jane& t ony Uoleatti <br /> • <br /> Project Address: ItDIB Cedar ST _ Parcel# OOg3$933OD26e0 <br /> City: ve(ett I State: Wp+ ZIP: ga2.Ol _ } <br /> Day Phone: 42$ $-i9 4255 <br /> Contractor Name So fit crow <br /> Contractor License It: soL-T- .5 s MR - <br /> Contractor Day Phone: 800 $05 9005 <br /> PVsystemdescription insta,tltrti9 �- r,- (OK\N ! s `31"Gm O1'1 f oof . <br /> • <br /> (include manufacturer <br /> and model It of PV �ttt - ted %1C%( 21001.'411s -SG1ectrt0. Pvt510)-11- <br /> modules <br /> 's tmodules and <br /> Inverters): <br /> 31)0eterrhi'1e if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system Is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules,[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by <br /> l 0 <br /> the local jurisdiction. <br /> 3, Rooftop Is made from lightweight material such'as a single layer of composition shingles, o <br /> metal roofing,lightweight masonry,or cedar Shingles, a <br /> 4, The installation shall comply with the manufacturer's Instructions.[IRC M2302,2] <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all 1� [l <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The Installation shall meet the requirements of the International Fire Code as amended . <br /> by WA State.[IRC M2302.2]• <br /> 7. The PV system is designed for the wind speed of the local area,and will be Installed perfd <br /> the manufacturer's specifications.[IRC M2302,2.1(1)) ! _ <br /> 8. The ground snow load does not exceed 70 pounds per square foot.f IRC M2302.2,1(2)] e fJ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances / ❑ <br /> weigh no more thanfour pounds persquare foot,[IRC tv12302.2.1(3)] /�` <br /> Enter total dead load of system(lbs/ft2): 6 4ti1�i�t�itit�I9lll+i. 2.5ibs(tt4 2• <br /> 10. To address uplift,modules are mounted no higher than 18".above the surface of the ,d <br /> roofing to which they are affixed,[IRC M2302.2.1(4)) • <br />