My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2810 COLBY AVE 2016-05-18
>
Address Records
>
COLBY AVE
>
2810
>
2810 COLBY AVE 2016-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 4:13:53 PM
Creation date
5/18/2016 4:13:51 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2810
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o- INSPECTION REPORT <br /> //, , 74Date L .17 Permit: 1 50 -00_0 <br /> iirr <br /> Contractor: <br /> Ck, Owner: AFfe-it 11\41 (�1�� <br /> Site Address: a$1 b 1dk4 k i R...____ <br /> TYPE OF INSPECTION REQ UESTED <br /> ELECTRICAL BUILDING MECHANICAL <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ■ roundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ ailing Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Li Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:(r5) 345- t l3oVY` <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED 111❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 04 iK) ^ 4� ,„0„. <br /> 4.4_ • <br /> I 1A)P°C _ MOS+ him <br /> afr/ >t/1 ii' -_ i 5-_*?,) <br /> 21- `Z'ativo .0 . Y�-4e v--- <br /> h,- uv��S - 9 CSS . <br /> Inspector: V Date: L .)-7/6 <br /> EIR(10/06) DATABAR,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.