Laserfiche WebLink
37. All other review processes listed in the zoning code as Review Process II; <br /> 38. All Review Process I and project permit applications that are not categorically <br /> exempt under SEPA. <br /> 39. Alternative Best Available Science decisions as provided by Section 19.37.050(E). <br /> 40. Accessory buildings over 200 square feet which have metal siding or corrugated <br /> roofing as provided by EMC 19.07.020.K. <br /> 41. Accessory buildings which exceed 1,000 square feet in area as provided by EMC <br /> 19.07.020.M. <br /> 42. Accessory buildings which exceed 15 feet in height as provided by EMC <br /> 19.07.020.J. <br /> 43. Rockeries and retaining walls retaining soil (fill) four feet or greater in height in <br /> required building setback areas, as provided by Section 19.39.150.C.5.d. <br /> * SEPA threshold determinations frequently include mitigation requirements as <br /> provided for in the SEPA ordinance (Chapter 20.04). Any SEPA condition based on <br /> SEPA substantive authority as provided for in the SEPA ordinance (Chapter 20.04) shall <br /> be identified in the land use permit decision, as provided in this integrated local project <br /> review process. <br /> ** An open public hearing may be required under the following circumstances, in <br /> which case the application shall be processed under Review Process III: (i) a public <br /> hearing is required by Title 18; (ii) any affected person files a written request for a <br /> hearing with the planning department within twenty-one days of the notice of application <br /> (public comment period); or(iii) either prior to or within the public comment period, the <br /> director or the city engineer and/or their designees require an open public hearing. <br /> Section 2. Severability. Should any section, paragraph, clause or phrase of this <br /> Ordinance, or its application to any person or circumstance, be declared unconstitutional <br /> or otherwise invalid for any reason, or should any portion of this Ordinance be pre- <br /> empted by state or federal law or regulations, this shall not affect the validity of the <br /> remaining portions of this Ordinance or its application to other persons or circumstances. <br /> Section 3. Conflict. In the event there is a conflict between the provisions of this <br /> Ordinance and any other City ordinance, the provisions of this Ordinance shall control. <br /> Section 4: The City Clerk and the codifiers of this Ordinance are authorized to make <br /> necessary corrections to this Ordinance including, but not limited to, the correction of <br /> scrivener's/clerical errors, references, ordinance numbering, section/subsection number <br /> and any references thereto. <br />