Laserfiche WebLink
DETENTION DESIGN <br /> The following data represents the input and results for sizing a detention tank using the <br /> SBUH method and the StormShed program. The predeveloped condition was 100% <br /> grass and the post developed condition all impervious. The release rate goals were 100% <br /> of the 2, 10 and 100 year storm as directed by the staff, since the discharge is to a <br /> combined sewer system. A goal of 50% of the 2 year storm was entered into StormShed, <br /> but that goal could not be reached due to the small area being detained. Thus the goal of <br /> 100%of the 2 year was used. <br /> Project Precips <br /> [2 yr] 1.55 in <br /> [10 yr] 2.25 in <br /> [100 yr] 3.25 in <br /> HOYT-C PRE Event Summary: <br /> BasinlD Peak Q Peak T Peak Vol Area Method Raintype <br /> Event <br /> (cfs) (hrs) (ac-ft) ac /Loss <br /> HOYT-C PRE 0.01 8.17 0.0066 0.15 SBUH/SCS TYPEIA 2 yr <br /> HOYT-C PRE 0.03 8.00 0.0130 0.15 SBUH/SCS TYPEIA 10 yr <br /> HOYT-C PRE 0.06 8.00 0.0235 0.15 SBUH/SCS TYPEIA 100 <br /> yr <br /> Drainage Area: HOYT-C PRE <br /> Hyd Method: SBUH Hyd Loss Method: SCS CN Number <br /> Peak Factor: 484.00 SCS Abs: 0.20 <br /> Storm Dur: 24.00 hrs Intv: 10.00 min <br /> Area CN TC <br /> Pervious 0.1500 ac 86.00 0.27 hrs <br /> Impervious 0.0000 ac 0.00 0.00 hrs <br /> Total 0.1500 ac <br /> Supporting Data: <br /> Pervious CN Data: <br /> PREDEV GRASS 86.00 0.1500 ac <br /> Pervious TC Data: <br /> Flow type: Description: Length: Slope: Coeff: Travel Time <br /> Sheet OVERLAND GRASS 99.00 ft 3.50% 0.2400 13.97 min <br /> HOYT-C POS Event Summary: <br /> BasinlD Peak Q Peak T Peak Vol Area Method Raintype <br /> Event <br /> (cfs) (hrs) (ac-ft) ac /Loss <br /> HOYT-C POS 0.05 8.00 0.0166 0.15 SBUH/SCS TYPE1A 2 yr <br /> HOYT-C POS 0.07 8.00 0.0253 0.15 SBUH/SCS TYPEIA 10 yr <br /> HOYT-C POS 0.11 8.00 0.0377 0.15 SBUH/SCS TYPEIA 100 <br /> yr <br /> Drainage Area: HOYT-C POS <br /> Hyd Method: SBUH Hyd Loss Method: SCS CN Number <br /> Peak Factor: 484.00 SCS Abs: 0.20 <br /> Storm Dur: 24.00 hrs Intv: 10.00 min <br /> Area CN TC <br /> Pervious 0.0000 ac 86.00 0.00 hrs <br /> Impervious 0.1500 ac 98.00 0.11 hrs <br /> Total 0.1500 ac <br /> Supporting Data: <br /> Impervious CN Data: <br /> 3011 Raven Crest,Bellingham,WA 98226 425-481-9687 <br /> (-4/6 <br />