My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3309 FEDERAL AVE 2016-05-19
>
Address Records
>
FEDERAL AVE
>
3309
>
3309 FEDERAL AVE 2016-05-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 4:20:16 PM
Creation date
5/19/2016 4:17:18 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3309
Notes
NOTE ON AND IN FILE FOLDER TO KEEP ALL DOCUMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> :� _ PUBLIC WORKS <br /> fr. .' gym?Err <br /> March 24, 2015 <br /> Azeem Khan <br /> PO Box 381 <br /> Redmond, WA 98073 <br /> Subject: Project: Khan <br /> Job Address: 3309 Federal Ave <br /> Plan Check No: CW1406-003 <br /> Dear Mr. Khan: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the <br /> (2012 International Building Code,) (2012 International Residential Code,) as amended by the <br /> State of Washington and/or Washington State Energy Code 2012 Edition, and adopted by the <br /> City of Everett, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two new complete sets of drawings reflecting the <br /> corrections requested, along with a reduced set of plans no larger than 11"x 17". <br /> 1. From the letter dated July 2 2014: <br /> "Provide lateral analysis prepared by a licensed WA State Structural Engineer, for wind and <br /> seismic loading" <br /> This is in reference to the bedroom and bathroom addition that was done on the rear (east <br /> side) of the structure design. The lateral design was done by Structural Design Associates <br /> and submitted F1 revised plans September 15, 2014. On subsequent plans submitted <br /> February 5th, (he stamp from Chris Covington of Structural Design Associates was <br /> removed from the plans, but the engineering for the lateral design remained on the <br /> drawings. The correction letter dated February 12, 2015 states: <br /> "1. The revised plans submitted February 5, 2015 have engineer's references to sheets that <br /> are not included in the plans submitted. Revise plans to reflect only one set of engineering." <br /> The plans submitted March 17, 2015 do not provide a lateral analysis for the addition on the <br /> back of the house. <br /> CITY OF EVERETT• 3200 Cedar Street- Everett, WA 98201 • (425)257-8800 • Fax (425) 257-8882 <br /> S:\lCommon\Clerical\]Heilman\CW1406-003(3309 Federal Ave)NEWEST.doc <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.