My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2751-04
>
Ordinances
>
Ordinance 2751-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 2:07:07 PM
Creation date
11/18/2014 2:07:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2751-04
Date
2/11/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2751-04 <br /> AN ORDINANCE creating a special improvement project entitled "I-5 <br /> Corridor Study," Fund 303, Program 032,to accumulate all costs for the <br /> improvement project, and repealing Ordinance No. 2381-99. <br /> WHEREAS, the City of Everett is committed to a planned street and road improvement <br /> program as a part of the City Transportation Improvement Program; and <br /> WHEREAS, the City of Everett has received approval for the utilization of Federal funds for <br /> the development of a design report and environmental impact study of the Interstate 5 corridor <br /> as an improvement project; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 032, entitled "I-5 <br /> Corridor Study," to accumulate all costs for the improvement project and repealing Ordinance <br /> No. 2381-99. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 032, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director", under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $1,625,016.00 is hereby appropriated to Fund 303, Program 032, "I-5 Corridor <br /> Study," as follows: <br /> A. Estimated Project Costs <br /> Preliminary Engineering $ 1,625,016.00 <br /> Total Estimated Cost $ 1,625,016.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.