My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ii <br /> I 2 Fabricator Drawing No. <br /> 3 Northwest Signal NWS 3565 <br /> 4 Supply Inc. <br /> 15 <br /> 6 Valmont Ind. Inc. DB00655 Rev. K <br /> 7 Sheet's 1, 2 & 3 of 3 <br /> 8 <br /> 19 Ameron Pole <br /> WA1OTR-1 Rev. F and <br /> 10 Prod. Div. WAPPBPBA Rev. B <br /> 11 <br /> I 12 <br /> 13 Union Metal Corp. TA-10035 Rev. R8 <br /> 14 Sht. 1 <br /> I 15 <br /> 16 West Coast <br /> 17 Engineering Group WSDOT-PP-01 Rev. 1 <br /> I 18 <br /> 19 KW Industries 10-200-PED-1 <br /> 20 Rev. 9, Sheets 1, 2 and 3 <br /> I 21 <br /> 22 Type PS Pedestrian signal standards shall conform to Standard Plan J- <br /> 23 20.16 or to one of the following pre-approved plans: <br /> 24 <br /> I 25 Fabricator Drawing No. <br /> 26 Northwest Signal NWS 3540 Rev. 4 and <br /> 27 Supply Inc. NWS 3540B Rev. 4 <br /> I 28 <br /> 29 Valmont Ind. Inc. DB00655 Rev. K <br /> 30 Sht. 1, 2 & 3of3 <br /> I 31 <br /> 32 Ameron Pole WA1OTR-1 Rev. F and <br /> 33 Prod. Div. WA1OTR-2 Rev. C <br /> I 34 <br /> 35 Union Metal Corp. TA-10025 Rev. R18 <br /> 36 Sht. 1 & 2 <br /> I 37 <br /> 38 West Coast <br /> 39 Engineering Group WSDOT-PP-02 Rev. 1 <br /> 40 <br /> 41 KW Industries 10-200-PED-1 <br /> 42 Rev. 9, Sheets 1, 2 and 3 <br /> 43 <br /> I 44 Type I Type I vehicle signal standards shall conform to Standard Plan J- <br /> 45 21.15 or to one of the following pre-approved plans: <br /> 46 <br /> I 47 Fabricator Drawing No. <br /> 48 Northwest Signal NWS 3540 Rev. 4 and <br /> 49 Supply Inc. NWS 3540B Rev. 4 <br /> I 50 <br /> 51 Valmont Ind. Inc. DB00655 Rev. K <br /> I 41'`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-121 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.