Laserfiche WebLink
I <br /> I <br /> 1 rDIVISIONIGR1 <br /> I <br /> 2 Division 1 <br /> 3 General Requirements <br /> 4 <br /> I <br /> 5 DESWORK GR1 <br /> 6 DESCRIPTION OF WORK <br /> 7 <br /> I 8 FDE�SWC RK DOCX <br /> 9 (March 13, 1995) <br /> 10 This Contract provides for the improvement of *** Pacific Ave between W Marine,mew <br /> I 11 Drive to, Rucker Ave. and 41st and Rucker intersection. The work will include <br /> 12 CirindinUA drainages improvement,=oHJVMA dvetlaw striping, .,expanded'.turn,^.lanesP with <br /> 13 improved'radii, ADAl'ramps upgrades,x,sidewalk'impr`ovements, signal improvements <br /> I 14 *** and other work, all in accordance with the attached Contract Plans, these Contract <br /> 15 Provisions, and the Standard Specifications. <br /> 16 <br /> I 17 P1r01:3?RTe <br /> 18 1-01.3 Definitions <br /> 19 (January 4, 2016 APWA GSP) <br /> I 20 <br /> 21 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 22 them with the following: <br /> 23 <br /> 24 Dates <br /> 25 Bid Opening Date <br /> I <br /> 26 <br /> 27 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> Award Date <br /> 28 The date of the formal decision of the Contracting Agency to accept the lowest <br /> I 29 responsible and responsive Bidder for the Work. <br /> 30 Contract Execution Date <br /> 31 The date the Contracting Agency officially binds the Agency to the Contract. <br /> I <br /> 32 Notice to Proceed Date <br /> 33 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 34 Substantial Completion Date <br /> 35 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 36 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 37 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> I 38 replacement of temporary substitute facilities, plant establishment periods, or <br /> 39 correction or repair remains for the Physical Completion of the total Contract. <br /> 40 Physical Completion Date <br /> I <br /> 41 The day all of the Work is physically completed on the project. All documentation <br /> 42 required by the Contract and required by law does not necessarily need to be <br /> 43 furnished by the Contractor by this date. <br /> 44 Completion Date <br /> 45 The day all the Work specified in the Contract is completed and all the obligations of <br /> 46 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> I <br /> I 415t STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-7 February 10, 2016 <br />