My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I i <br /> ........ . • <br /> Item Ref.: Plan <br /> +' iUnt Item Description Unit Cost .Total. <br /> Amount <br /> No. Specs. , Y e , . . • <br /> - I <br /> Ii.. 22 8-14 870 SY CEMENT CONC.SIDEWALK <br /> 49.00 42630.00 <br /> ..• , <br /> 1111 _ <br /> $ $ <br /> 23 8-04 1,920 IF CEMENT CONC.TRAFFIC <br /> CURB AND GUTTER <br /> i 111 $ 30.00 57600.00 <br /> 1 <br /> . . <br /> ii 24 8-04.5 250 LF CEMENT CONC.PEDESTRIAN $ <br /> CURB $ $25.00 6250.00 <br /> II 25 8-14 2 EACH TYPE B CURB RAMP <br /> k <br /> , (specs) $ 1150.00 2300.00 <br /> f <br /> $ <br /> 1 <br /> 1 26 8-14 2 EACH TYPE D CURB RAMP Will-1 4' <br /> . ' (specs) LANDING <br /> $ 1 /00.06 $ a a,OP CD <br /> II27 8-14 7 EACH TYPE D CURB RAMP WITH 8' <br /> (specs) LANDING $ $1600.00 11200.00 <br /> I28 8-14 1 EACH TYPE PERPENDICULAR B <br /> (specs) RAMP $ $1300.00 1300.00 <br /> 1.. <br /> 29 8-06 130 SY CEMENT CONCRETE <br /> DRIVEWAY RAMP TYPE 1 56.00 7280.00 <br /> $ $ <br /> . . <br /> I30 1-07.15 1 LS SPCC PLAN <br /> $ <br /> 500.00 $ 500.00 <br /> I• 31 8-01.5 30 DAY ESC LEAD a O.Do <br /> $ <br /> ply., +-2400:414 600(100 <br /> $ <br /> I32 8-01 5,000 FA EROSION/WATER <br /> POLLUTION CONTROL 1 .90 $ 5,000.00 <br /> $ <br /> I: 33 8-01.5 2,850 SY SEEDING, FERTILIZING,AND <br /> MULCHING 6.00 17100.00 <br /> $ $ <br /> I 34 I 8-02.3(4) 60 <br /> 1 CY TOPSOIL TYPE C <br /> i <br /> $ 90.• i00 Is 5400.00 <br /> I i i <br /> I . <br /> I 41'STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> 91.1.1,4140.4.2*.d•Mn,...*roV,..p - . . $...ea.w.e.a*massaramtare........*eszewea—,....ar...tam <br /> FED AID#STPUL-9931(012); PW43472 4 February 17,2016 <br /> Ifage 170 <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.