Laserfiche WebLink
I <br /> Item Ref'. . Plan <br /> Unit• .: item Description Unit Cost.'. Total Amount <br /> No. �SPecs. Qty 2. <br /> I48 1- - 15,000 FA REIMBURSEMENT FOR <br /> 1 07.13(4) THIRD PARTY DAMAGE $ 1 .00 $ 15,000.00 <br /> 49 8-30 1 EACH BUS SHELTER CONCRETE <br /> PAD $ 1000.00 $ 1000.00 <br /> 1f - <br /> 50 8-30 1 EACH BUS SHELTER RELOCATION <br /> $ 3100:00 $ 3100:00 <br /> 51 8-22 780 LF ' PLASTIC CROSSWALK <br /> F STRIPE(24") $ 10.00 $ 7800.00 <br /> I, <br /> P52 <br /> P ____ <br /> 8-25 301 LF PLAS I IC STOP LINE(24") <br /> $ 13.00 $ 3913.00 <br /> 1 53 8-22 7,200 LF PLAS I IC LINE <br /> 2.00 14400.00 <br /> $ <br /> 54 8-22 800 LF PLASTIC WIDE LANE LINE <br /> $ 3.00 $ 2400.00 <br /> I55 8-25 16 EACH PLASTIC TRAFFIC ARROW <br /> $ 145.00 $ 2320.00 <br /> . 56 I 8-22 1,600 LF PAINTED TRAFFIC CURB <br /> 1 1.00 1600.00 <br /> $ <br /> 11 57 8-33 50,000 FA PRIVATE IMPROVEMENT <br /> RESTORATION AND OTHER 1 .0050,000.00 <br /> MODIFICATION S $ <br /> 58 8-34 50,000 FA POTHOLE-VACUUM <br /> i $ 1:00 $ 50,000.00 <br /> 59 1-2.6 1 LS TYPE B PROGRESS <br /> SCHEDULE $ 5000.00 $ 5000.00 <br /> 60 1-05.18 500 LS RECORD DRAWINGS <br /> 'LOU 500.00 <br /> 0 <br /> ` $__...._..._._._. $ __• <br /> I - <br /> I 41"STREET TO WMVD FREIGHT t <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 6 February 17,2016 <br /> IPage 10 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />