Laserfiche WebLink
'' <br /> I <br /> (tem Ref Plan Unit` • Item Description Unit Cost Total Amount <br /> No. ,Specs. Qty - <br /> 61 2-09.5 10,000 FA FORCE ACCOUNT LEAN <br /> CONCRETE 1 .00 $ 10,000 <br /> •62 8-01.3(8) 200 HR STREET CLEANING <br /> 190.00 38000.00 <br /> 63 2-01.5 5,000 FA ROADSIDE CLEANUP <br /> $ 1 .00 $ 5,000 <br /> 11 CEMENT CONCRETE <br /> 64 5-06 240 SYPAVEMENT BASE $ 62.00 $ 14880.00 <br /> i, — ._ TEMPORARY PAVEMENT <br /> 65 8-23 10,000 LE MARKING-SHORT .40 $ 4000.00 <br /> DURATION <br /> 1 STRUCTURE EXCAVATION <br /> 6 -08 230 C Y CLASS S INCL.HAUL 48.00 11040.00 <br /> 111 SHORING OR EXTRA <br /> t 081,000 SF EXCAVATION CIASS 3 1 .50 s 1500.00 <br /> BASE BID AMOUNT $ :A i1 5B I753 lav <br /> 111 <br /> I <br /> I 4151 STREET TO MVO FREIGHT <br /> CORRIDOR IMPROVEMENTS { <br /> FED AID STPUL-9931(012);PW#3472 7 February 17,2016 <br /> 'Page 5 <br /> Provided to Builders Exchange of VVA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />