My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Local Agency Name , <br /> City of Everett Local Agency Subcontractor List <br /> Prepared in compliance with RCW 39.30.060 as amended <br /> Local Agency Address <br /> 2930 Wetmore <br /> Everett WA 98201 To Be Submitted with the Bid Proposal <br /> 1 Project Name 41ST STREET TO WEST MARINE VIEW DRIVE FREIGHT CORRDIOR IMPROVEMENTS <br /> Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for <br /> performance of the work of heating,ventilation and air conditioning,plumbing,as described in Chapter 18.106 <br /> RCW,and electrical,as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> the same work will result in your bid being non-responsive and therefore void. <br /> Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of heating, <br /> .::ii <br /> ventilation and air conditioning,plumbing,as described in Chapter 18.106 RCW,and electrical as described in Chapter <br /> 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s)name. <br /> To the extent the Proiect includes one or more categories of work referenced in RCW 39.30.060,and no <br /> subcontractor is listed below to perform such work,the bidder certifies that the work will either(I)be <br /> ': performed by the bidder itself,or(ii)be performed by a lower tier subcontractor who will not contract directly <br /> with the bidder. ] / <br /> 1 Subcontractor Name�}n""^ v�' � �✓ <br /> Work to be Performed FLFCTRICAL _. <br /> Subcontractor Name <br /> Work to be Performed <br /> Subcontractor Name <br /> Work to be Performed <br /> I Subcontractor Name _. <br /> Work to be Performed <br /> Subcontractor Name <br /> Work to be Performed <br /> SubcontractorName —__.._....._...._..---...-- —_ ..__......_........_......_.__-•- -__. <br /> Work to be PerformedI _. __-----___--- <br /> * Bidder's are notified that is the opinion of the enforcement agency that PVC or metal conduit,junction boxes, etc, are <br /> considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use <br /> and no wiring or electrical current is connected during the project <br /> SR DOT FOlin. f .Ji',,\El <br /> 1 <br /> I <br /> age 178 Local Agency Subcontractor List <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxvva.com -Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.