Laserfiche WebLink
I <br /> I <br /> 1 Notice of Award <br /> I 2 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 3 Contracting Agency's acceptance of the Bid Proposal. <br /> 4 <br /> 5 Notice to Proceed <br /> I6 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 7 and directing the Contractor to proceed with the Work and establishing the date on <br /> 8 which the Contract time begins. <br /> 19 <br /> 10 Traffic <br /> 11 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, <br /> I 12 and equestrian traffic. <br /> 13 <br /> 14Aii-7-R1 <br /> I 15 Bid Procedures and Conditions <br /> 16 <br /> 17 �1 X02 i. RTF <br /> I 18 1-02 BID PROCEDURES AND CONDITIONS <br /> 19 <br /> 20 1-02.1 Prequalification of Bidders <br /> I 21 <br /> 22 Delete this section and replace it with the following: <br /> 23 <br /> I 24 1-02.1 Qualifications of Bidder <br /> 25 (January 24, 2011 APWA GSP) <br /> 26 <br /> I <br /> 27 <br /> 28 Before award of a public works contract, a bidder must meet at least the minimum <br /> qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified <br /> 29 to be awarded a public works project. <br /> 1 30 <br /> 31 COEt 02.2 rRTF <br /> 32 1-02.2 Plans and Specifications <br /> I <br /> 33 (June 27, 2011 APWA GSP) <br /> 34 <br /> 35 Delete this section and replace it with the following: <br /> 36 <br /> I37 Information as to where Bid Documents can be obtained or reviewed can be found in the <br /> 38 Call for Bids (Advertisement for Bids) for the work. <br /> 39 <br /> I <br /> 40 After award of the contract, plans and specifications will be issued to the Contractor at <br /> 41 no cost as detailed below: <br /> 42 <br /> 1 To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 1 0 Furnished automatically <br /> Iupon award. <br /> Contract Provisions 5 Furnished automatically <br /> upon award. <br /> I <br /> I 4155 STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-9 February 10,2016 <br />