My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,' <br /> ARM <br /> s- APWA-WA Division 1 Committee rev. 1/8/2016 <br /> I <br /> Proposal for incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br /> • <br /> • propose below, the total percent of construction aggregate and concrete materials to be <br /> incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> I, the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent(By Weight) <br /> of Recycled Material, of the Standard Specifications. <br /> Proposed total percentage: 5% percent. <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> �' materials actually incorporated into the Project, in accordance with the`6{i,WiAr,pySP in Section <br /> 1-06.6 of the Special Provisions. \,..\\co{'w � 11C', ,.,:'' <br /> 1 Bidder: MARSHBANK CONSTRU TION4 <br /> ca 2 <br /> Signature of Authorized Official: :...0. 1: :, _ 0 F <br /> DAVE MARSHBANK-PRESIDENT CA' Date: MARCH 15.2016 <br /> �,/'s. 4/4SH10 <br /> • <br /> I <br /> 1 <br /> •I <br /> I <br /> I • <br /> I <br /> I <br /> Page 189 Proposal for Incorporating Recycled Materials into the Project <br /> I <br /> Provided to Builders Exchange of WA. Inc. For usage Conditions Agreement see wnmv.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.