Laserfiche WebLink
I <br /> 1 <br /> 2 02 6 RTF <br /> 3 1-02.6 Preparation of Proposal <br /> 4 (June 27, 2011 APWA GSP) <br /> ' 5 <br /> 6 Supplement the second paragraph with the following: <br /> 7 4. If a minimum bid amount has been established for any item, the unit or lump sum <br /> 8 price must equal or exceed the minimum amount stated. <br /> 9 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be <br /> 10 initialed by the signer of the bid. <br /> 1 11 <br /> 12 Delete the last paragraph, and replace it with the following: <br /> 13 <br /> 14 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. <br /> 15 <br /> 16 A bid by a corporation shall be executed in the corporate name, by the president or a <br /> 17 vice president (or other corporate officer accompanied by evidence of authority to sign). <br /> 18 <br /> 19 A bid by a partnership shall be executed in the partnership name, and signed by a <br /> ' 20 <br /> 21 partner. A copy of the partnership agreement shall be submitted with the Bid Form if any <br /> D/M/WBE requirements are to be satisfied through such an agreement. <br /> 22 <br /> 23 A bid by a joint venture shall be executed in the joint venture name and signed by a <br /> 24 member of the joint venture. A copy of the joint venture agreement shall be submitted <br /> 25 with the Bid Form if any DAN/MBE requirements are to be satisfied through such an <br /> 26 agreement. <br /> 27 <br /> 28 ri•`=02.6(.141RTF <br /> 29 Add the following new section: <br /> 30 <br /> 31 1-02.6(1) Recycled Materials Proposal <br /> 32 (January 4, 2016 APWA GSP) <br /> 33 <br /> 34 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials <br /> 35 into the project, using the form provided in the Contract Provisions. <br /> 36 <br /> 37 102 6 GRI' <br /> 38 Preparation of Proposal <br /> 39 <br /> 40 1-02.6.INST2'GR1 <br /> 41 The fourth paragraph of Section 1-02.6 is revised to read: <br /> 42 <br /> 43 k0 6YOPiT11.O�GR1 <br /> 44 (May 7, 2012) <br /> 45 The Bidder shall submit with the Bid a completed Disadvantaged Business Enterprise <br /> 46 (DBE) Utilization Certification, when required by the Special Provisions. For each and <br /> 47 every DBE firm listed on the Bidder's completed Disadvantaged Business Enterprise <br /> 48 Utilization Certification, the Bidder shall submit written confirmation from that DBE firm <br /> ' 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-11 February 10,2016 <br />