My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 3/8" FULL DEPTH EXPANSION V-GROVE CONTROL <br /> A.„iiiJOINT 30' MIN INTERVAL MATCH JOINT 1/4” DEEP 5' <br /> CURB FULL DEPTH JOINTS INTERVALS BETWEEN FULL <br /> igat4 <br /> AND HALF DEPTH EXPANSION <br /> 11 JOINTS (TYP) <br /> 3/8 HALF DEPTH <br /> EXPANSION JOINT <br /> I TYPE A-1 15' INTERVALS <br /> CURB & ` ryA <br /> CUTTER ''IN, <br /> ` �}�, \ �4'Tj� .. TYPE A-1 <br /> `��' S c CURB & <br /> 1 COLD JOINT CUTTER <br /> /S% 141PrN6N1-c?4(41114111111110000Y3/8 HALF DEPTH `\a EXPANSION JOINT � �R.'"15' INTERVALS ' 04.\- '���IBETWEEN FULL DEPTH ``✓;'N I <br /> d- <br /> o V-GROVE CONTROL 1/2" FULL DEPTH EXPANSION <br /> I ? JOINT 1/4" DEEP 5' JOINT 30' MIN INTERVAL <br /> o, AND NHALF DEPTTEVALS H EXPANSEEN IION PLAN VIEWS <br /> JOINTS (TYP) 5' MIN <br /> (SEE NOTE 7 BELOW) CEMENT CONCRETE <br /> COLD JOINT SIDEWALK <br /> Y HMA OR CONC. 0.02:1 <br /> `; PAVEMENT <br /> o <br /> cn <br /> II o ♦ + <br /> Af <br /> TYPE A-1 "QplG✓A <br /> CURB & 2" CRUSHED SURFACING BASE <br /> III l' <br /> CUTTER SEE COURSE, COMPACTED TO 95% MAX DENSITY <br /> o STD 305A <br /> a <br /> TYPICAL SECTION <br /> I UNOTES <br /> E, 1. SIDEWALKS SHALL BE A MINIMUM OF 4" THICK, AND SHALL BE COMMERCIAL MIX CONCRETE AS CALLED OUT <br /> IN WSDOT STD SPECS., WITH AIR ENTRAINMENT (MIN 4.5 %, MAX 6.5 %). <br /> F2. SIDEWALK FULL DEPTH EXPANSION JOINTS SHALL GENERALLY BE PLACED TO MATCH THOSE IN ADJACENT <br /> CURB & GUTTER (WITHOUT PLANTER STRIP). MAXIMUM SPACING OF 30 FEET, FINAL SPACING DETERMINATION <br /> o SHALL BE DECIDED BY THE INSPECTOR IN THE FIELD. <br /> r 3. SUBGRADE SHALL BE COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DENSITY. <br /> N <br /> N. <br /> M 4. SIDEWALK SHALL BE AT LEAST 6" THICK IN DRIVEWAYS AND BEHIND ROLL-CURB (STD 305B). <br /> F5. THE FINISHED SIDEWALK SHALL BE SPRAYED WITH A TRANSPARENT CURING COMPOUND COVERED BY <br /> o WATERPROOF PAPER OR PLASTIC SHEETING IN THE EVENT OF RAIN OR OTHER INCLEMENT WEATHER. CURING <br /> 0_ TIME SHALL BE FOR A MINIMUM OF 72 HOURS. <br /> Iu <br /> W 6. ALL JOINTS SHALL BE CLEANED AND EDGED WITH AN EDGER HAVING A 1/4" RADIUS. <br /> ,, <br /> 7. SIDEWALKS ARE 5' MIN. WIDE, EXCEPT 6' ALONG ARTERIALS, IN COMMERCIAL AREAS, OR AS APPROVED BY <br /> Z9I THE CITY ENGINEER. <br /> ,, CITY OF EVERETT CEMENT CONCRETE CURB 7-D2t2013 <br /> PUBLIC WORKS & SIDEWALK DETAILS <br /> I VEPEr DEPARTMENT SHEET 1 OF 2 306 <br /> COE Std Dwa: <br />
The URL can be used to link to this page
Your browser does not support the video tag.