Laserfiche WebLink
I <br /> 1 <br /> I 2 If the project has FHWA funding and requires DBE Written Confirmation Documents or <br /> 3 Good Faith Effort Documentation, then to be considered responsive, the Bidder shall <br /> 4 submit with their Bid Proposal, written Confirmation Documentation from each DBE firm <br /> I <br /> 5 listed on the Bidder's completed DBE Utilization Certification, form 272-056A EF, as <br /> 6 required by Section 1-02.6. <br /> 7 <br /> 8 The Contracting Agency will not open or consider any Bid Proposal that is received after <br /> I9 the time specified in the Call for Bids for receipt of Bid Proposals, or received in a <br /> 10 location other than that specified in the Call for Bids. <br /> 11 <br /> I 12 COE'1, OLZ.%pel y.p to COE RTF; <br /> 13 1-02.9 Delivery of Proposal r <br /> 14 <br /> I15 (******) <br /> ' 16 Revise the first paragraph to read: <br /> 17 <br /> 18 Each proposal shall be submitted in a sealed envelope, with the Project Name and <br /> 19 Project Number as stated in the Advertisement for Bids clearly marked on the outside of <br /> I <br /> 20 the envelope, or as otherwise stated in the Bid Documents, to ensure proper handling <br /> 21 and delivery. <br /> 22 <br /> I 23 Sealed Proposal shall be received at the following location prior to the specified time as <br /> 24 mention in the provision section 1-02.12: <br /> 25 <br /> I <br /> 26 <br /> 27 City of Everett <br /> City Clerk's Office <br /> 28 1st Floor Wall Street Building <br /> 29 2930 Wetmore Ave. <br /> 30 Everett, WA 98201 <br /> 31 <br /> 32 i`-v� 1O.R i <br /> I 33 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> 34 (July 23, 2015 APWA GSP) <br /> Il 35 <br /> 36 Delete this section, and replace it with the following: <br /> 37 <br /> 38 After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> I <br /> 39 withdraw, revise, or supplement it if: <br /> 40 <br /> 41 1. The Bidder submits a written request signed by an authorized person and <br /> I 42 physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 43 2. The Contracting Agency receives the request before the time set for receipt of <br /> 44 Bid Proposals, and <br /> I <br /> 45 <br /> 46 3. The revised or supplemented Bid Proposal (if any) is received by the <br /> Contracting Agency before the time set for receipt of Bid Proposals. <br /> 47 <br /> I 48 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> 49 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> I 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-13 February 17,2016 <br />