My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> IFINAL JOINT MUST SAW—CUT OR UNE DRILL <br /> BE SAW—CUT ASPHALT CONCRETE (2"MIN) TO <br /> UNDERLYING CONCRETE MATCH THICKNESS OF EXISTING <br /> IEXISTING ASPHALT CONCRETE <br /> I <br /> 6" a. , , 6" MIN CEMENT CONCRETE <br /> MIN <br /> I EXISTING CEMENT <br /> '(/// <br /> ��� 6" MIN <br /> COURSEHED SURFACING <br /> CONCRETE <br /> —w— SEE STD PLAN 610 <br /> I <br /> EXISTING ASPHALT CONCRETE OVER CEMENT CONCRETE <br /> IASPHALT CONCRETE (3" MIN) <br /> FINAL JOINT MUST REPLACEMENT PATCH TO BE 1" <br /> BE SAW—CUT THICKER THAN PREVIOUSLY IXISILD <br /> I / <br /> IEXISTING ASPHALT 6" 4 - 6" MIN CRUSHED SURFACING <br /> MIN TOP COURSE <br /> CONCRETE <br /> IE --4— SEE STD PLAN 610 <br /> I <br /> 111 c'lLni:. EXISTING ASPHALT CONCRETE OVER PREPARED GRADE <br /> /---CEMENT CONCRETE (8" MIN) <br /> I FINAL JOINT MUST <br /> I BE SAW—CUT <br /> REPLACEMENT PATCH TO BE 1" <br /> THICKER THAN PREVIOUSLY EXISTED <br /> M I <br /> 0D(ISTING CEMENT <br /> z CONCRLIL PAVEMENT 6• / �j� 6" MIN CRUSHED SURFACING <br /> III <br /> MIN TOP COURSE <br /> a — SEE STD PLAN 610 <br /> Uo <br /> o" <br /> EXISTING CEMENT CONCRETE OVER PREPARED GRADE <br /> I Q <br /> ci NOTES: <br /> 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED WITH TEMPORARY ASPHALT AT THE <br /> o END OF EACH WORK DAY, UNLESS PERMISSION IS GRANTED TO DO OTHERWISE BY THE CITY ENGINEER. <br /> m 2. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN 2 WEEKS OF COMPLETION <br /> ,5 OF WORK WITHIN ROADWAY AREA. <br /> I <br /> 3. CEMENT CONCRETE FOR PATCHING SHALL BE COMMERCIAL MIX AS CALLED OUT IN WSDOT STD SPECS. <br /> -2, ' CITY OF EVERETT 7 2-2013 <br /> e: <br /> PUBLIC WORKS PAVEMENT PATCHING <br /> VERE7T DEPARTMENT DETAILS 316 <br /> %7 CQE Std Dwg: <br />
The URL can be used to link to this page
Your browser does not support the video tag.