My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> MI . PF <br /> TT <br /> IM <br /> LI <br /> I ' i1i KEY <br /> aaa . H = HEIGHT OF ROCK WALL. <br /> I •44 44 a 7 = NO TEMPORARY EXCAVATION <br /> • 144444 WITHIN 5FT BEHIND <br /> _ . a a a 4 . ROCKERY. <br /> a 4111111.1144<1.44 a ' PF = NO PERMANENT EXCAVATION <br /> a a OR SURCHARGING BEHIND <br /> 1'—O" aaa ROCKERY CLOSER THAN A <br /> • <br /> aa ' DISTANCE EQUAL TO H. <br /> aaac <br /> 2 • a a° TC = NO TEMPORARY EXCAVATION <br /> 1 . 4 BELOW LIMITS DEFINED BY A <br /> •t'.v.111"•• <br /> LINE 1' OUT FROM BASE OF <br /> I <br /> ROCKERY WITH A SLOPE OF <br /> 1 1H:-1V TO A DISTANCE <br /> cu <br /> 1 V EQUAL TO 2/3H FROM <br /> u ROCKERY BASE. <br /> �-� TC PC = MAX FINISHED GRADE OR <br /> Lo <br /> u; DEF NEDENT BY A FROMON BASE <br /> Ln <br /> • PC OOFF ROCKERYE <br /> H :- 1V FOR A MIN o DISTANCE EQUAL TO H <br /> co FROM ROCKERY BASE. <br /> N <br /> I <br /> g <br /> m <br /> M DESIGN AND POST CONSTRUCTION LIMITATIONS <br /> Y <br /> H <br /> CL <br /> O <br /> 0 a NOTES <br /> K <br /> 0 1. ALL NEW ROCKERY DESIGN AND PLACEMENT WILL FOLLOW TO CONSTRUCTION LIMITATIONS DESCRIBE <br /> IABOVE, AND FOLLOW THE GUIDELINES ESTABLISHED BY THE ASSOCIATED ROCKERY CONTRACTORS <br /> o "STANDARD ROCK WALL CONSTRUCTION GUIDELINES" DATED 12/2/92 INCLUDING ANY AND ALL <br /> o REVISIONS. <br /> I E. 2. MODIFICATIONS TO OR PLACEMENT OF SUBSEQUENT UNDERGROUND UTILITIES WILL ALSO FOLLOW <br /> LIMITATIONS DESCRIBED ABOVE. <br /> L <br /> c <br /> 0 <br /> IozS <br /> En <br /> U <br /> O . <br /> ��, CITY OF EVERETT ROCKERY 7-2-2013 <br /> // Date: <br /> VERETT PUBLIC WORKS (PLACEMENT & POST Date: <br /> DEPARTMENT CONSTRUCTION LIMITS) 324B <br /> <`. %� COE Std Dw.: _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.