Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 1 6. Standard Specifications, <br /> I 2 7. Contracting Agency's Standard Plans or Details (if any), and <br /> 3 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 4 <br /> I 5 1=05G R: _ <br /> 6 Control <br /> of Work <br /> 7 <br /> I 8 1-05 &GR1' <br /> 9 Conformity With And Deviations From Plans And Stakes <br /> 10 <br /> I 11 105`4INST1 GR1 <br /> 12 Section 1-05.4 is supplemented with the following: <br /> 13 <br /> 14 1' 05.4OPT1.GR1 <br /> 15 (April 4, 2011) <br /> I16 Contractor Surveying - Structure <br /> 17 Copies of the Contracting Agency provided primary survey control data are available for <br /> 18 the bidder's inspection at the office of the Project Engineer. <br /> 19 <br /> I <br /> 20 The Contractor shall be responsible for setting, maintaining, and resetting all alignment <br /> 21 stakes, slope stakes, and grades necessary for the construction of bridges, noise walls, <br /> 22 and retaining walls. Except for the survey control data to be furnished by the <br /> I <br /> 23 <br /> 24 Contracting Agency, calculations, surveying, and measuring required for setting and <br /> maintaining the necessary lines and grades shall be the Contractor's responsibility. <br /> 25 <br /> I <br /> 26 <br /> 27 The Contractor shall inform the Engineer when monuments are discovered that were <br /> not identified in the Plans and construction activity may disturb or damage the <br /> 28 monuments. All monuments noted on the plans "DO NOT DISTURB" shall be protected <br /> I 29 throughout the length of the project or be replaced at the Contractors expense. <br /> 30 <br /> 31 Detailed survey records shall be maintained, including a description of the work <br /> 32 performed on each shift, the methods utilized, and the control points used. The record <br /> I33 shall be adequate to allow the survey to be reproduced. A copy of each day's record <br /> 34 shall be provided to the Engineer within three working days after the end of the shift. <br /> 35 <br /> I <br /> 36 The meaning of words and terms used in this provision shall be as listed in "Definitions <br /> 37 of Surveying and Associated Terms" current edition, published by the American <br /> 38 Congress on Surveying and Mapping and the American Society of Civil Engineers. <br /> I 39 <br /> 40 The survey work by the Contractor shall include but not be limited to the following: <br /> 41 <br /> I <br /> 42 <br /> 43 1. Verify the primary horizontal and vertical control furnished by the Contracting <br /> Agency, and expand into secondary control by adding stakes and hubs as well <br /> 44 as additional survey control needed for the project. Provide descriptions of <br /> I 45 secondary control to the Contracting Agency. The description shall include <br /> 46 coordinates and elevations of all secondary control points. <br /> 47 <br /> 48 2. Establish, by placing hubs and/or marked stakes, the location with offsets of <br /> I <br /> 49 foundation shafts and piles. <br /> I 41s`STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-19 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.