My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 DBE COA Goal <br /> 2 The Contracting Agency has established a COA Contract goal in the amount of: *** <br /> 3 14% ***. i' <br /> 4 <br /> 5 DBE Eligibility/Selection of DBEs <br /> 6 A Directory of Certified DBE Firms denoting the Description of Work the DBE11 <br /> 7 Contractors are certified to perform is available at: <br /> 8 <br /> 9 www.omwbe.wa.gov/certification/index.shtml. III <br /> 10 <br /> 11 The directory provides plain language on the Description of Work that the <br /> 12 listed DBE's have been certified by the Office of Minority and Women's <br /> 13 Business Enterprises (OMWBE) to perform. The Bidder shall use the <br /> 14 Directory of Certified DBE Firms to confirm if a DBE is certified for the <br /> 15 "Description of Work" the Bidder lists on the DBE Utilization Certification form <br /> 16 # 272-056 EF (see form instructions) and therefore qualifies for credit towards 11, <br /> 17 the COA goal. <br /> 18 <br /> 19 Crediting DBE Participation 1111 <br /> 20 Joint Venture <br /> 21 When a DBE performs as a participant in a joint venture, only that portion of <br /> 22 the total dollar value of the Contract equal to the distinct, clearly defined <br /> 23 portion of the Work that the DBE performs with its own forces shall be <br /> 24 credited. <br /> 25 <br /> 26 DBE Prime Contractor <br /> 27 A DBE Prime Contractor may only take credit for that portion of the total dollar <br /> 28 value of the Contract equal to the distinct, clearly defined portion of the Work <br /> 29 that the DBE Prime performs with its own forces. <br /> 30 <br /> 31 DBE Subcontractor <br /> 32 When a DBE firm participates as a Subcontractor only that portion of the total <br /> 33 dollar value of the Contract equal to the distinct, clearly defined portion of the <br /> 34 Work that the DBE performs with its own forces shall be credited. <br /> 35 <br /> 36 • Include the cost of supplies and materials obtained by the DBE for the <br /> 37 Work in the Contract including supplies purchased or equipment <br /> 38 leased by the DBE. <br /> 39 o However, you may not take credit for supplies, materials, and <br /> 40 equipment the DBE Subcontractor purchases or leases from the <br /> 41 Prime Contractor or its affiliate. In addition, Work performed by a <br /> 42 DBE, utilizing resources of the Prime Contractor or its affiliates <br /> 43 shall not be credited. <br /> 44 <br /> 45 • In very rare situations, a DBE firm may utilize equipment and/or <br /> 46 personnel from a non-DBE firm other than the Prime Contractor or its <br /> 47 affiliates. Should this situation arise the arrangement must be short- <br /> 48 term and have prior written approval from the Office of Equal <br /> 49 Opportunity (OEO). <br /> 50 <br /> 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-44 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.