My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 The Contractor and the Contracting Agency mutually agree that those claims that total <br /> 2 $250,000 or less, submitted in accordance with Section 1-09.11 and not resolved by <br /> 3 nonbinding ADR processes, shall be resolved through litigation unless the parties <br /> 4 mutually agree in writing to resolve the claim through binding arbitration. <br /> 5 <br /> 6 I <br /> i$0� 1�33�`A.R�TP <br /> 7 1-09.13(3)A Administration of Arbitration <br /> 8 (July 23, 2015 APWA GSP) <br /> 9 <br /> 10 Revise the third paragraph to read: <br /> 11 <br /> 12 The Contracting Agency and the Contractor mutually agree to be bound by the decisionI <br /> 13 of the arbitrator, and judgment upon the award rendered by the arbitrator may be <br /> 14 entered in the Superior Court of the county in which the Contracting Agency's <br /> 15 headquarters is located, provided that where claims subject to arbitration are asserted <br /> 16 against a county, RCW 36.01.05 shall control venue and jurisdiction of the Superior <br /> 17 Court. The decision of the arbitrator and the specific basis for the decision shall be in <br /> 18 writing. The arbitrator shall use the Contract as a basis for decisions. <br /> 19 <br /> 20 fi: 0GR1 <br /> 21 Temporary Traffic Control <br /> 22 <br /> 23 1g10:2f GR=1 <br /> 24 Traffic Control Management <br /> 25 <br /> 260 :; r Rei <br /> 27 General I <br /> 28 <br /> 29 �. I Sy GRi <br /> 30 Section 1-10.2(1) is supplemented with the following: <br /> 31 <br /> 32 d1, I0 )'O T' 4 <br /> 33 (January 8, 2016) <br /> 34 Only training with WSDOT TCS card and WSDOT training curriculum is recognized <br /> 35 in the State of Washington. The Traffic Control Supervisor shall be certified by one <br /> 36 of the following: I <br /> 37 <br /> 38 The Northwest Laborers-Employers Training Trust <br /> 39 27055 Ohio Ave. <br /> 40 Kingston, WA 98346 <br /> 41 (360) 297-3035 <br /> 42 <br /> 43 Evergreen Safety Council <br /> 44 12545 135th Ave. NE <br /> 45 Kirkland, WA 98034-8709 <br /> 46 1-800-521-0778 or <br /> 47 (425) 814-3930 <br /> 48 <br /> 49 The American Traffic Safety Services AssociationI <br /> 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-74 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.