My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The Contracting Agency may sample each aggregate component prior to introduction to <br /> 2 the weigh batcher or as otherwise determined by the Engineer. Each component will be <br /> 3 sieve analyzed separately in accordance with WSDOT FOP for WAQTC/AASHTO Test <br /> 4 Method T-27/11. All aggregate components will be mathematically re-combined by the <br /> 5 proportions (percent of total aggregate by weight) provided by the Contractor on <br /> 6 Concrete Mix Design Form 350-040. 1 <br /> 7 <br /> 8 9-03.8(1) General Requirements <br /> 9 The first paragraph up until the colon is revised to read: <br /> 10 <br /> 11 Preliminary testing of aggregates for source approval shall meet the following test <br /> 12 requirements: <br /> 13 <br /> 14 The list in the first paragraph is supplemented with the following: <br /> 15 <br /> 16 Sand Equivalent 45 min. <br /> 17 <br /> 18 The following new paragraph is inserted after the first paragraph: <br /> 19 <br /> 20 Aggregate sources that have 100 percent of the mineral material passing the No. 4 <br /> 21 sieve shall be limited to no more than 5 percent of the total weight of aggregate. <br /> 22 <br /> 23 9-03.8(2) HMA Test Requirements <br /> 24 The second paragraph (up until the colon) is revised to read: <br /> 25 <br /> 26 The mix design shall produce HMA mixtures when combined with RAP, RAS, coarse <br /> 27 and fine aggregate within the limits set forth in Section 9-03.8(6) and mixed in the <br /> 28 laboratory with the designated grade of asphalt binder, using the Superpave gyratory <br /> 29 compactor in accordance with WSDOT FOP for AASHTO T 312, and at the required <br /> 30 gyrations for N initial, N design, and N maximum with the following properties: <br /> 31 <br /> 32 The third paragraph is revised to read: <br /> 33 <br /> 34 The mix criteria for Hamburg Wheel-Track Testing and Indirect Tensile Strength do not <br /> 35 apply to HMA accepted by commercial evaluation. <br /> 36 <br /> 37 9-03.8(3)B Gradation — Recycled Asphalt Pavement and Mineral Aggregate <br /> 38 This section is supplemented with the following: <br /> 39 <br /> 40 For HMA with greater than 20 percent RAP by total weight of HMA the RAP shall be <br /> 41 processed to ensure that 100 percent of the material passes a sieve twice the size of <br /> 42 the maximum aggregate size for the class of mix to be produced. <br /> 43 <br /> 44 When any amount of RAS is used in the production of HMA the RAS shall be milled, I <br /> 45 crushed or processed to ensure that 100 percent of the material passes the 1/2 inch <br /> 46 sieve. Extraneous materials in RAS such as metals, glass, rubber, soil, brick, tars, <br /> 47 paper, wood and plastic shall not exceed 2.0 percent by mass as determined on <br /> 48 material retained on the No. 4 sieve. <br /> 49 <br /> 50 9-03.14(3) Common Borrow <br /> 51 This section is revised to read: <br /> 52 <br /> 111 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.