My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 subject to arbitration under the arbitration clause or otherwise be <br /> I <br /> 2 subject to claims or disputes. <br /> 3 <br /> 4 6. A statement giving the dates the Engineer must make a decision to <br /> I 5 accept or reject the conceptual proposal, the date that approval to <br /> 6 proceed must be received, and the date the work must begin in order <br /> 7 to not delay the contract. If the Contracting Agency does not approve <br /> 8 the VECP by the date specified by the Contractor in their proposal the <br /> I 9 VECP will be deemed rejected. <br /> 10 <br /> 11 7. The submittal will include an analysis on other Work that may have <br /> 12 costs that changed as a result of the VECP. Traffic control and <br /> 13 erosion control shall both be included in addition to any other <br /> 14 impacted Work. <br /> I 15 <br /> 16 After review of the proposal, the Engineer will respond in writing with <br /> 17 acceptance or rejection of the concept. This acceptance shall not be <br /> 18 construed as authority to proceed with any change contract work. Concept <br /> 19 approval allows the Contractor to proceed with the Work needed to develop <br /> 20 final plans and other information to receive formal approval and to support <br /> 21 preparation of a change order. <br /> I 22 <br /> 23 1-04.4(2)C2 Formal Approval <br /> 24 The Contractor's submittal to the Engineer for formal approval shall include the <br /> 1 25 following: <br /> 26 <br /> 27 1. Deleted Work— Include the calculated quantities of unit price Work to <br /> I 28 be deleted. Include the proposed partial prices for portions of lump <br /> 29 sum Work deleted. For deletion of force account items include the <br /> 30 time and material estimates. <br /> I 31 <br /> 32 2. Added Work— Include the calculated quantities of unit price Work to <br /> 33 be added, either by original unit Contract prices or by new, negotiated <br /> I 34 unit prices. For new items of Work include the quantities and <br /> 35 proposed prices. <br /> 36 <br /> 37 3. Contractor's Engineering Costs — Submit the labor costs for the <br /> I38 engineering to develop the proposal; costs for Contractor employees <br /> 39 utilized in contract operations on a regular basis shall not be included. <br /> 40 <br /> I 41 4. Schedule Analysis — If the VECP is related to time savings, the <br /> 42 Contractor shall submit a partial progress schedule showing the <br /> 43 changed Work. The submittal shall also include a discussion <br /> I 44 comparing the partial progress schedule with the approved progress <br /> 45 schedule for the project. <br /> 46 <br /> I 47 5. Working Drawings —Type 3 Working Drawings shall be submitted; <br /> 48 those drawings which require engineering shall be a Type 3E. <br /> 49 <br /> 50 Formal approval of the proposal will be documented by issuance of a change <br /> 51 order. The VECP change order will contain the following statements which the <br /> 52 Contractor agrees to by signing the change order: <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.