My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 unacceptable. The Contractor shall immediately take such corrective measures as are <br /> 2 necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br /> I 3 diligently, and without interruption until physical completion of the listed deficiencies. <br /> 4 This process will continue until the Engineer is satisfied the listed deficiencies have been <br /> 5 corrected. <br /> I 6 <br /> 7 If action to correct the listed deficiencies is not initiated within 7 days after receipt of the <br /> 8 written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> I 9 <br /> 10 Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br /> Section 1-05.7. <br /> 11 The Contractor will not be allowed an extension of contract time because of a delay in <br /> 12 the performance of the work attributable to the exercise of the Engineer's right <br /> 13 hereunder. <br /> 14 <br /> 15 Upon correction of all deficiencies, the Engineer will notify the Contractor and the <br /> I 16 Contracting Agency, in writing, of the date upon which the work was considered <br /> 17 physically complete. That date shall constitute the Physical Completion Date of the <br /> 18 contract, but shall not imply acceptance of the work or that all the obligations of the <br /> I 19 Contractor under the contract have been fulfilled. <br /> 20 <br /> 21 1-05.11(3) Operational Testing <br /> I 22 <br /> 23 It is the intent of the Contracting Agency to have at the Physical Completion Date a <br /> 24 complete and operable system. Therefore when the work involves the installation of <br /> 25 machinery or other mechanical equipment; street lighting, electrical distribution or signal <br /> I26 systems; irrigation systems; buildings; or other similar work it may be desirable for the <br /> 27 Engineer to have the Contractor operate and test the work for a period of time after final <br /> 28 inspection but prior to the physical completion date. Whenever items of work are listed in <br /> 29 the Contract Provisions for operational testing they shall be fully tested under operating <br /> 30 conditions for the time period specified to ensure their acceptability prior to the Physical <br /> 31 Completion Date. During and following the test period, the Contractor shall correct any <br /> Il 32 items of workmanship, materials, or equipment which prove faulty, or that are not in first <br /> 33 class operating condition. Equipment, electrical controls, meters, or other devices and <br /> 34 equipment to be tested during this period shall be tested under the observation of the <br /> 35 Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> 36 they were installed. The Physical Completion Date cannot be established until testing <br /> 37 and corrections have been completed to the satisfaction of the Engineer. <br /> I 38 <br /> 39 The costs for power, gas, labor, material, supplies, and everything else needed to <br /> 40 successfully complete operational testing, shall be included in the unit contract prices <br /> 41 related to the system being tested, unless specifically set forth otherwise in the proposal. <br /> I42 <br /> 43 Operational and test periods, when required by the Engineer, shall not affect a <br /> 44 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> I <br /> 45 <br /> 46 <br /> 47 1-05.13.RTF <br /> I 48 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> 49 (August 14, 2013 APWA GSP) <br /> 50 <br /> I51 Delete the sixth and seventh paragraphs of this section. <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> I FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 17 December 23,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.