My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 prices or in any other Contract amount. However, the Contracting Agency will not <br /> 2 provide additional compensation to the Prime Contractor or Subcontractor for Retail <br /> 3 Sales Taxes paid by the Contractor in addition to the Retail Sales Tax on the total111 <br /> 4 contract amount. Typically, these taxes are collected on items such as the purchase or <br /> 5 rental of; tools, machinery, equipment, or consumable supplies not integrated into the <br /> 6 project. Such sales taxes shall be included in the unit Bid prices or in any other Contract <br /> 7 amounts. <br /> 8 <br /> 9 The Summary of Quantities in the Contract Plans identifies those parts of the project <br /> 10 that are subject to Retail Sales Tax under Section 1-07.2(2). <br /> 11 <br /> 12 1-07.2(3) Services <br /> 13 This section is revised to read: <br /> 14 <br /> 15 Any contract wholly for professional or other applicable services is generally not subject <br /> 16 to Retail Sales Tax and therefore the Contractor shall not collect Retail Sales Tax from <br /> 17 the Contracting Agency on those Contracts. Any incidental taxes paid as part of <br /> 18 providing the services shall be included in the payments under the contract. <br /> 19 111 <br /> 20 1-07.15 Temporary Water Pollution/Erosion Control <br /> 21 This section's title is revised to read: <br /> 22 <br /> 23 1-07.15 Temporary Water Pollution Prevention <br /> 24 <br /> 25 This section's content is deleted. <br /> 26 <br /> 27 1-07.23(1) Construction Under Traffic <br /> 28 In the second paragraph, the following new sentence is inserted after the second sentence: <br /> 29 <br /> 30 Accessibility to existing or temporary pedestrian push buttons shall not be impaired. <br /> 31 <br /> 32 1-08.AP1 <br /> 33 Section 1-08, Prosecution and Progress <br /> 34 August 3, 2015 <br /> 35 1-08.1 Subcontracting <br /> 36 The eighth paragraph is revised to read: <br /> 37 <br /> 38 On all projects, the Contractor shall certify to the actual amounts paid to Disadvantaged, <br /> 39 Minority, Women's, or Small Business Enterprise firms that were used as <br /> 40 Subcontractors, lower tier subcontractors, manufacturers, regular dealers, or service <br /> 41 providers on the Contract. This Certification shall be submitted to the Project Engineer <br /> 42 on a monthly basis each month between Execution of the Contract and Physical <br /> 43 Completion of the Contract using the application available at: <br /> 44 https://remoteapps.wsdot.wa.gov/mapsdata/tools/dbeparticipation. The monthly report is <br /> 45 due 20 calendar days following the end of the month. A monthly report shall be <br /> 46 submitted for every month between Execution of the Contract and Physical Completion <br /> 47 regardless of whether payments were made or work occurred. <br /> 48 <br /> 111 <br /> 49 The ninth paragraph is deleted and replaced with the following new paragraph: <br /> 50 <br /> 1 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.